My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-05_REVISION - M2004028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004028
>
2025-05-05_REVISION - M2004028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:10:43 AM
Creation date
5/5/2025 10:28:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004028
IBM Index Class Name
Revision
Doc Date
5/5/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Michele M and Frederic V Eichler IV
Type & Sequence
SI1
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2025 Reclamation Cost Estimate Summary <br /> Site: The Broyles Pit Permit Action: 2025 Inspection Permit/Job#: M2004028 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4/16/2025 County: Las Animas Filename: M028-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001a Grading in West Pit(Push-up method) DOZER 1 1.04 $334 <br /> 001b Spread 6 inches of topsoil over graded west DOZER 1 0.10 $32 <br /> hi hwall <br /> 002 Re-grade East Pit slopes and repair erosion gullies DOZER 1 2.29 $779 <br /> 003 Plow/chisel north stockpile area and low areas in REVEGE 1 2.00 $410 <br /> west pit <br /> 004 Reve etation of Affected Land REVEGE 1 12.00 $7,669 <br /> 005 Equipment Mobilization/Demobilization MOBILIZE 1 3.40 $2,643 <br /> SUBTOTALS: 20.83 $11,867 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $240 <br /> Performance bond: 1.05 Total= $125 <br /> Job superintendent: 10.41 Total= $825 <br /> Profit: 10.00 Total= $1,187 <br /> TOTAL O&P= $2,376 <br /> CONTRACT AMOUNT(direct+O&P)= $14,243 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $605 <br /> Reclamation management and/or administration: 5.00 $712 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $4,194 <br /> TOTAL BOND AMOUNT(direct+indirect)= $16,061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.