Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#OO1B Page 2 of 2 <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.7161 <br /> Adjusted unit production: 1,002.54 LCY/hr <br /> Adjusted fleet production: 1002.54 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.321/LCY <br /> Total job time: 0.10 Hours <br /> Total job cost: $32 <br />