My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-19_REVISION - M2000039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000039
>
2025-03-19_REVISION - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 8:23:30 AM
Creation date
3/19/2025 1:01:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
Revision
Doc Date
3/19/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Delhur Industries, Inc.
Type & Sequence
SI1
Inspection Date
10/24/2024
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 001 Page 1 of 2 <br /> <br />BULLDOZER WORK <br /> <br />Task description: Grade waste rock to highwall Site: McKenna Limestone Quarry Permit Action: 2024 Inspection Permit/Job#: M2000039 <br /> <br />PROJECT IDENTIFICATION Task #: 001 State: Colorado Abbreviation: None <br />Date: 11/1/2024 County: Huerfano Filename: 1 <br />User: AMG <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS XR Series II <br />Horsepower: 240 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $90.24 NA <br />Operating Cost/Hour: $78.95 100 <br />Ripper own. <br />Cost/Hour: $9.25 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.59 NA Total unit Cost/Hour: $217.03 <br />Total Fleet Cost/Hour: $217.03 <br /> <br />MATERIAL QUANTITIES Initial Volume: 4,500 <br />Swell factor: 1.000 <br />Loose volume: 4,500 LCY Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly <br />production: <br />518.9 LCY/hr <br /> <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 6,000 feet <br /> <br />Material weight: 3,300 lbs/LCY <br /> <br />Weight description: Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.)
The URL can be used to link to this page
Your browser does not support the video tag.