My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-19_REVISION - M2000039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000039
>
2025-03-19_REVISION - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 8:23:30 AM
Creation date
3/19/2025 1:01:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
Revision
Doc Date
3/19/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Delhur Industries, Inc.
Type & Sequence
SI1
Inspection Date
10/24/2024
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Reclamation Cost Summary Site: McKenna Limestone Quarry Permit Action: 2024 Inspection Permit/Job#: M2000039 <br /> <br />PROJECT IDENTIFICATION Task #: 000 State: Colorado Abbreviation: None <br />Date: 11/1/2024 County: Huerfano Filename: M039-000 <br />User: AMG Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task Hours Cost <br />001 Grade waste rock to highwall DOZER 1 28.84 $6,259 <br />002 Spread 6-inches of topsoil over 2.4 acres DOZER 1 12.57 $2,728 <br />003 Revegetation of 2.4 acres REVEGE 1 3.00 $4,733 <br />004 Mob/DeMob MOBILIZE 1 3.86 $2,117 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />48.27 <br /> <br />$15,837 <br /> <br />INDIRECT COSTS OVERHEAD AND PROFIT: Liability insurance: 2.02 Total = $320 <br />Performance bond: 1.05 Total = $166 <br />Job superintendent: 24.14 Total = $1,913 <br />Profit: 10.00 Total = $1,584 <br /> TOTAL O & P = $3,983 <br /> CONTRACT AMOUNT (direct + O & P) = $19,820 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: Financial warranty processing (legal/related costs): $500 Total = $500 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $842 <br />Reclamation management and/or administration: 5.00 $991 <br /> <br />CONTINGENCY: 0.00 Total = $0 <br /> <br />TOTAL INDIRECT COST = $6,316 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $22,153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.