My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-19_REVISION - M2000039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000039
>
2025-03-19_REVISION - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 8:23:30 AM
Creation date
3/19/2025 1:01:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
Revision
Doc Date
3/19/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Delhur Industries, Inc.
Type & Sequence
SI1
Inspection Date
10/24/2024
Email Name
AMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 001 Page 2 of 2 <br /> <br />Material consistency: 0.700 (CAT HB) <br />Dozing method: 1.100 (50% SL) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.697 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.3007 <br /> <br />Adjusted unit <br />production: 156.03 LCY/hr <br />Adjusted fleet <br />production: 156.03 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.391/LCY <br /> <br />Total job time: 28.84 Hours <br />Total job cost: $6,259 <br />
The URL can be used to link to this page
Your browser does not support the video tag.