My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02210 UNDERGROUND WORKINGS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02210 Underground Workings Page 2 <br />2. PART 2: PRODUCTS <br />2.1. Materials <br />A. Fill materials will consist of Structural Fill, Select Structural Fill, and Coarse Shaft Backfill <br />identified in Section 02200, Cast‐In‐Place Concrete identified in Section 03300, Cemented <br />Rockfill identified in Section 03310, Concrete Plug identified in Section 03320, and <br />Flowable Fill identified in Section 03330. <br /> <br />3. PART 3: EXECUTION <br />3.1. Excavation <br />A. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open‐cut excavations on a <br />regular basis for signs of instability. Should signs of instability be noted, CONTRACTOR <br />shall immediately undertake remedial measures and shall notify MANAGER immediately. <br />Permanent cut slopes shall be left in smooth, safe, and stable condition at the end of the <br />workday. <br />B. CONTRACTOR shall conduct all excavation and shoring operations in compliance with <br />applicable Colorado State and Federal government laws and regulations. <br />3.2. Fill Placement <br />A. Structural Fill <br />1. CONTRACTOR shall condition, place and compact Structural Fill by a method <br />compaction technique, as discussed in Section 2200.0. <br />Maximum rock size for rock fill shall be two‐thirds of the compacted lift thickness, <br />unless otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC&V. <br />B. Select Structural Fill <br />1. CONTRACTOR shall condition and compact the Select Structural Fill using a method <br />specification on 3‐foot thick lifts that result in a firm surface that will be approved <br />by the CERTIFYING ENGINEER. <br />C. Coarse Shaft Backfill <br />1. Coarse Shaft Backfill shall be placed in the underground workings as part of <br />remediation, as shown in the DRAWINGS.