My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02210 UNDERGROUND WORKINGS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02210 Underground Workings Page 3 <br />2. CONTRACTOR shall compact and condition the final surface of the Coarse Shaft <br />Backfill using a method specification that results in a firm surface that will be approved <br />by CERTIFYING ENGINEER. <br />D. Cast‐in‐Place Concrete <br />1. Cast‐in‐Place Concrete shall be placed in the underground working as part of <br />remediation, as show in the DRAWINGS. <br />E. Cemented Rockfill <br />1. Cemented Rockfill shall be placed in the underground working as part of remediation, <br />as show in the DRAWINGS. <br />F. Concrete Plug <br />1. Concrete Plug shall be placed in the underground working as part of remediation, as <br />show in the DRAWINGS. <br />G. Flowable Fill <br />1. Flowable Fill shall be placed in the underground working as part of remediation, as <br />show in the DRAWINGS. <br /> <br />3.3. Native Material <br />For the remediation of shafts greater than 25 feet, which are currently backfilled with native <br />material, CONTRACTOR shall excavate the current native backfill to a depth of 25 feet below <br />Soil Liner Fill subgrade elevation. The surface of the native material at this elevation will then be <br />compacted using a method specification that results in a firm surface that will be approved by <br />CERTIFYING ENGINEER. CONTRACTOR shall then remediate the underground working using <br />Coarse Shaft Backfill, Cement Plug, and Cemented Rockfill as shown on the DRAWINGS. <br />3.4. Blasting <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted <br />surface is below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted <br />surface using a method specification approved by the CERTIFYING ENGINEER, and then <br />remediate according to the DRAWINGS to achieve the design grades and elevations. If the <br />blasted surface is above the Soil Liner subgrade elevation, the CERTIFYING ENGINEER assess <br />the foundation conditions and recommend whether the CONTRACTOR shall over excavate and <br />backfill with Cemented Rockfill and Structural Fill, or if the CONTRACTOR shall remove excess <br />material and compact the final grade surface using a method specification approved by the <br />CERTIFYING ENGINEER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.