Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02210 UNDERGROUND WORKINGS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02210 Underground Workings    Page 3  <br />2. CONTRACTOR shall compact and condition the final surface of the Coarse Shaft  <br />Backfill using a method specification that results in a firm surface that will be approved  <br />by CERTIFYING ENGINEER.  <br />D. Cast‐in‐Place Concrete  <br />1. Cast‐in‐Place Concrete shall be placed in the underground working as part of  <br />remediation, as show in the DRAWINGS.  <br />E. Cemented Rockfill  <br />1. Cemented Rockfill shall be placed in the underground working as part of remediation,  <br />as show in the DRAWINGS.  <br />F. Concrete Plug  <br />1. Concrete Plug shall be placed in the underground working as part of remediation, as  <br />show in the DRAWINGS.  <br />G. Flowable Fill  <br />1. Flowable Fill shall be placed in the underground working as part of remediation, as  <br />show in the DRAWINGS.  <br />  <br />3.3. Native Material  <br />For the remediation of shafts greater than 25 feet, which are currently backfilled with native  <br />material, CONTRACTOR shall excavate the current native backfill to a depth of 25 feet below  <br />Soil Liner Fill subgrade elevation. The surface of the native material at this elevation will then be  <br />compacted using a method specification that results in a firm surface that will be approved by  <br />CERTIFYING ENGINEER. CONTRACTOR shall then remediate the underground working using  <br />Coarse Shaft Backfill, Cement Plug, and Cemented Rockfill as shown on the DRAWINGS.  <br />3.4. Blasting  <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted  <br />surface is below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted  <br />surface using a method specification approved by the CERTIFYING ENGINEER, and then  <br />remediate according to the DRAWINGS to achieve the design grades and elevations. If the  <br />blasted surface is above the Soil Liner subgrade elevation, the CERTIFYING ENGINEER assess  <br />the foundation conditions and recommend whether the CONTRACTOR shall over excavate and  <br />backfill with Cemented Rockfill and Structural Fill, or if the CONTRACTOR shall remove excess  <br />material and compact the final grade surface using a method specification approved by the  <br />CERTIFYING ENGINEER.  <br />