My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02210 UNDERGROUND WORKINGS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02210 Underground Workings Page 1 <br />SECTION 02210 UNDERGROUND WORKING REMEDIATION <br />1. PART 1: GENERAL <br />1.1. Summary <br />This SPECIFICATION describes the activities associated with the remediation of the underground <br />workings located within the limits of the valley leach facility. <br />1.2. Related Sections <br />Refer to the following Sections for related work: <br /> Section 02200 ‐ Earthworks <br /> Section 03300 ‐ Cast In Place Concrete <br /> Section 03310 ‐ Cemented Rockfill <br /> Section 03320 ‐ Concrete Plug <br /> Section 03330 ‐ Flowable Fill <br />1.3. Quality Assurance <br />A. All work shall be monitored and tested in compliance with the requirements of the <br />SPECIFICATIONS. <br />B. All CQA soils testing (both field and laboratory testing) will be the responsibility of CQA <br />Monitor, as identified in the Earthworks CQA plan. CONTRACTOR shall be responsible <br />for cooperating with CQA Monitor during all testing activities. CONTRACTOR shall <br />provide equipment and labor to assist CQA Monitor in sampling, if requested, and shall <br />also provide access to all areas requiring testing activities. Quality Control testing shall <br />be the responsibility of the CONTRACTOR. <br />C. All excavation, backfill, and grading operations shall be carried out under the observation <br />of MANAGER and CERTIFYING ENGINEER. <br />D. Any work found unsatisfactory or any work disturbed by subsequent operations before <br />acceptance is granted shall be corrected by CONTRACTOR, at its sole cost. <br />1.4. Submittals <br />A. CONTRACTOR shall provide method of Coarse Shaft Backfill and Select Structural Fill <br />placement. <br />B. CONTRACTOR shall provide method of compacting Native material, Coarse Shaft <br />Backfill, and Select Structural Fill, to meet the compaction requirements identified in <br />Sections 3.2 and 3.3. <br />C. CONTRACTOR shall provide blasting design for approval by MANAGER.
The URL can be used to link to this page
Your browser does not support the video tag.