Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 17  <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection  <br />that the underlying geosynthetics are free of holes, tears, wrinkles, or foreign objects.  <br />MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for wrinkles  <br />prior to placement of Drain Cover Fill. As instructed by MANAGER, CONTRACTOR  <br />shall "work out" wrinkles to the satisfaction of MANAGER and CERTIFYING ENGINEER  <br />prior to placement of the Drain Cover Fill. In all cases, wrinkles shall not be of a size  <br />that they could fold back on themselves. Wrinkles greater than one foot shall be  <br />removed and repaired by the INSTALLER.  <br />3. CONTRACTOR shall place Drain Cover Fill in a single 24‐inch loose lift. The tracked  <br />equipment shall operate only over previously placed Drain Cover Fill. CONTRACTOR  <br />shall not operate equipment directly on geosynthetics. Only a dozer with a ground  <br />pressure not exceeding 8.7 psi can be used to place Drain Cover Fill. A CAT 12G motor  <br />grader, or equivalent approved by CERTIFYING ENGINEER, can be used for Drain  <br />Cover Fill final grading. Equipment used for placement will not be allowed to pivot  <br />on one track (i.e. no abrupt or sharp turns). There shall be no downhill placement on  <br />slopes steeper than 4H:1V. Material can be placed along contours if buttressed from  <br />below.  Motor graders shall not be allowed to make abrupt turns, brake suddenly, or  <br />dig blade in which results in the tires spinning on the Drain Cover Fill surface.  <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to  <br />travel over the geomembrane or on top of Solution Collection piping unless a  <br />thickness of at least 45 inches of Drain Cover Fill has been placed over the  <br />geomembrane and on top of Solution Collection piping. The CONTRACTOR will be  <br />required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING  <br />ENGINEER that the equipment and procedures used are not detrimental to the  <br />geomembrane and piping, at no cost to CC&V. Off road haul truck traffic shall require  <br />a minimum of 42 inches for Cat 740 (or equivalent), a minimum of 60 inches for Cat  <br />773 (or equivalent), and a minimum of 120 inches for CAT 777 (or equivalent) of Drain  <br />Cover Fill placed over the geomembrane and solution collection piping.  <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet.  <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying  <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of  <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR  <br />to remove Drain Cover Fill to expose the geosynthetics. CONTRACTOR shall uncover,  <br />repair any observed damage of the underlying geosynthetics, in accordance with the  <br />repair requirements of Sections 02776 and 02777 of the SPECIFICATIONS, and  <br />recover, at no cost to CC&V.  <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that the geomembrane liner  <br />is not exposed to ultraviolet light for more than 180 days.  <br />8. CONTRACTOR shall provide close continuous monitoring at the point of placement  <br />during the placement of the Drain Cover Fill over geosynthetics.