My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 17 <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection <br />that the underlying geosynthetics are free of holes, tears, wrinkles, or foreign objects. <br />MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for wrinkles <br />prior to placement of Drain Cover Fill. As instructed by MANAGER, CONTRACTOR <br />shall "work out" wrinkles to the satisfaction of MANAGER and CERTIFYING ENGINEER <br />prior to placement of the Drain Cover Fill. In all cases, wrinkles shall not be of a size <br />that they could fold back on themselves. Wrinkles greater than one foot shall be <br />removed and repaired by the INSTALLER. <br />3. CONTRACTOR shall place Drain Cover Fill in a single 24‐inch loose lift. The tracked <br />equipment shall operate only over previously placed Drain Cover Fill. CONTRACTOR <br />shall not operate equipment directly on geosynthetics. Only a dozer with a ground <br />pressure not exceeding 8.7 psi can be used to place Drain Cover Fill. A CAT 12G motor <br />grader, or equivalent approved by CERTIFYING ENGINEER, can be used for Drain <br />Cover Fill final grading. Equipment used for placement will not be allowed to pivot <br />on one track (i.e. no abrupt or sharp turns). There shall be no downhill placement on <br />slopes steeper than 4H:1V. Material can be placed along contours if buttressed from <br />below. Motor graders shall not be allowed to make abrupt turns, brake suddenly, or <br />dig blade in which results in the tires spinning on the Drain Cover Fill surface. <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to <br />travel over the geomembrane or on top of Solution Collection piping unless a <br />thickness of at least 45 inches of Drain Cover Fill has been placed over the <br />geomembrane and on top of Solution Collection piping. The CONTRACTOR will be <br />required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER that the equipment and procedures used are not detrimental to the <br />geomembrane and piping, at no cost to CC&V. Off road haul truck traffic shall require <br />a minimum of 42 inches for Cat 740 (or equivalent), a minimum of 60 inches for Cat <br />773 (or equivalent), and a minimum of 120 inches for CAT 777 (or equivalent) of Drain <br />Cover Fill placed over the geomembrane and solution collection piping. <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet. <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br />to remove Drain Cover Fill to expose the geosynthetics. CONTRACTOR shall uncover, <br />repair any observed damage of the underlying geosynthetics, in accordance with the <br />repair requirements of Sections 02776 and 02777 of the SPECIFICATIONS, and <br />recover, at no cost to CC&V. <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that the geomembrane liner <br />is not exposed to ultraviolet light for more than 180 days. <br />8. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Drain Cover Fill over geosynthetics.
The URL can be used to link to this page
Your browser does not support the video tag.