Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 16  <br />surface to the satisfaction of MANAGER and CERTIFYING ENGINEER, at no additional  <br />cost to CC&V.  <br />14. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for  <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan  <br />until the surface is covered. CONTRACTOR shall repair all weather related damage to  <br />Soil Liner Fill surfaces or other portions of the Work that have or have not been  <br />covered by geomembrane, at no additional cost to CC&V. If any moisture is allowed  <br />to collect under the geomembrane prior to or after final seaming and softens the Soil  <br />Liner Fill, the geomembrane shall be removed and CONTRACTOR shall recondition  <br />and recompact the Soil Liner Fill to meet all placement and trimming  <br />SPECIFICATIONS, at no additional cost to CC&V.  <br />15. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fill and backfill  <br />all holes with MANAGER and CERTIFYING ENGINEER approved moisture‐  <br />conditioned Soil Liner Fill or bentonite. Compact with a Proctor hammer or other  <br />suitable device that will achieve a kneading type of compaction and will achieve the  <br />required density.  <br />16. CONTRACTOR shall verify the final thickness of Soil Liner Fill to determine compliance  <br />with this SPECIFICATION. Thickness verification shall be performed at a minimum  <br />frequency of two measurements per acre using a soil‐coring device, unless directed  <br />otherwise by MANAGER. CONTRACTOR shall record as part of the as‐built  <br />documentation the location, elevation, and thickness of each Soil Liner Fill  <br />verification test. CQA MONITOR will witness all verification measurements.  <br />CONTRACTOR shall backfill all holes with MANAGER and CERTIFYING ENGINEER  <br />approved moisture‐ conditioned Soil Liner Fill compacted with a Proctor hammer or  <br />other suitable device that will achieve a kneading type of compaction and will achieve  <br />the required density, or bentonite. Areas with deficiencies shall be reworked by  <br />CONTRACTOR, until acceptable measurements are obtained at no additional cost to  <br />CC&V.  <br />17. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS,  <br />MANAGER and CERTIFYING ENGINEER will establish the extent of the  <br />nonconforming area. The nonconforming area shall be re‐worked by CONTRACTOR  <br />until acceptable test results are obtained at no additional cost to CC&V  <br />18. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by  <br />CQA MONITOR. No geosynthetics will be allowed to be placed on frozen material, as  <br />defined in Section 3.6.A.10, without the area in question being retested by the CQA  <br />MONITOR.  <br />H. Drain Cover Fill  <br />1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on the  <br />DRAWINGS.