Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 15  <br />CONTRACTOR shall allow the wet soil to dry to the specified moisture content range  <br />before re‐compaction of fill and placement of geosynthetic materials.  <br />7. CONTRACTOR shall assist CQA MONITOR in obtaining soil samples for CQA testing.  <br />Soil Liner Fill sampling shall be scheduled by CQA MONITOR with CONTRACTOR to  <br />facilitate CQA field testing.  <br />8. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free‐draining  <br />condition. The CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill  <br />placed within the limits of the valley leach facility to prevent the drying out of the  <br />surface.  <br />9. CONTRACTOR shall compact corners and other areas inaccessible to driven  <br />compaction equipment using hand‐operated 500‐pound vibratory plate or vibratory  <br />smooth‐drum compaction equipment approved by MANAGER and CERTIFYING  <br />ENGINEER.  <br />10. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design grades shown  <br />on the DRAWINGS.  <br />11. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller to  <br />remove ridges and surface irregularities greater than 0.5 inches in height.  <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place  <br />geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt  <br />methods as necessary to obtain the same final surface preparations that would be  <br />obtained by the passage of a smooth‐drum roller on flat or level ground. Pushing of  <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts on  <br />the surface of the Soil Liner Fill from grading equipment shall be repaired by  <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as  <br />approved by CQA MONITOR.  <br />12. CONTRACTOR will remove angular protruding rocks greater than 3/4 inches in  <br />diameter from the compacted Soil Liner Fill surface. Indentations left in the Soil Liner  <br />Fill Surface after removal of the rocks shall be filled with Soil Liner Fill or other  <br />suitable fill approved by CQA MONITOR, and compacted to achieve final grade. Areas  <br />of the Soil Liner Fill surface with concentrated gravelly areas will have suitable fill  <br />approved by CQA MONITOR placed on top and compacted to achieve final grade. A  <br />maximum thickness of 0.5 inches of suitable fill will be placed on the Soil Liner Fill.  <br />13. MANAGER and CERTIFYING ENGINEER will identify any areas of significant  <br />desiccation, crusting, or erosion of a lift surface. Soil Liner Fill surfaces found to have  <br />desiccation cracks greater than 0.25‐inches in width or depth, or which exhibit  <br />swelling, heaving or other similar conditions shall be replaced or reworked by  <br />CONTRACTOR to remove such defects. Desiccation cracks on the Soil Liner Fill surface  <br />less than 0.25‐inches in width or depth shall be compacted with a smooth drum  <br />roller. CONTRACTOR shall take whatever steps necessary to prepare Soil Liner Fill