Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 14  <br />underlying geosynthetics, in accordance with the repair requirements of Sections  <br />02776 and 02777 of the SPECIFICATIONS and recover, at no cost to CC&V.  <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low  <br />Volume Solution Collection Fill placement is carried out at night. A minimum of 2‐ <br />foot candles measured at the synthetic liner, shall be used when Low Volume  <br />Solution Collection Fill placement is carried out at night.  <br />G. Soil Liner Fill  <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on  <br />the DRAWINGS and shall begin only after completion of all, or MANAGER and  <br />CERTIFYING ENGINEER approved portion of, excavation and Structural Fill placement  <br />in the valley leach facility.  <br />2. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a  <br />coefficient of permeability of less than 1x10‐6 cm/sec, measured according to ASTM  <br />Method D5084, Method D. Any Soil Liner Fill not meeting the permeability  <br />specification shall be removed and replaced with material meeting the permeability  <br />specification, at no additional cost to CC&V.  <br />3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the  <br />compacted lift thickness is a minimum of 12 inches.  <br />4. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of the maximum  <br />dry density as determined by the Standard Proctor density test (ASTM D698).  The  <br />moisture content shall be within +3% to ‐2% of the optimum moisture content. Both  <br />moisture and density shall be uniform throughout the lift. If the Soil Liner Fill cannot  <br />be conditioned to meet the placement SPECIFICATIONS, the material shall be  <br />removed and replaced with new Soil Liner Fill at the CONTRACTOR's expense.  The  <br />CONTRACTOR shall reduce the clod size of the soil liner fill to a size that is acceptable  <br />to the CERTIFYING ENGINEER, the method by which will be approved by CERTIFYING  <br />ENGINEER and MANAGER prior to implementation.  <br />5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and  <br />during compaction of the material. CONTRACTOR shall be responsible for meeting  <br />moisture content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be  <br />conditioned to meet the placement SPECIFICATIONS, the material shall be removed  <br />and replaced with new Soil Liner Fill at no additional cost to CC&V. MANAGER may  <br />require CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24  <br />hours prior to the Soil Liner Fill being placed.  <br />6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If a  <br />lift of compacted Soil Liner Fill dries out during placement operations, CONTRACTOR  <br />shall scarify, moisture condition the dry soil and recompact the lift. If a lift of  <br />compacted Soil Liner Fill becomes overly wet due to precipitation or over watering,