Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 13  <br />6. Rubber tired construction equipment shall not be allowed to travel over the  <br />geomembrane or on top of Solution Collection piping unless a thickness of at least  <br />45 inches of Low Volume Solution Collection Fill has been placed over the  <br />geomembrane and on top of Solution Collection piping. The CONTRACTOR will be  <br />required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING  <br />ENGINEER  that the equipment and procedures used are not detrimental to the  <br />geomembrane and piping, at no cost to CC&V. Off road haul truck traffic shall require  <br />a minimum of 60 inches for Cat 773 (or equivalent) of Low Volume Solution Collection  <br />Fill placed over the geomembrane and solution collection piping, and a minimum of  <br />120 inches for CAT 777 (or equivalent) of Low Volume Solution Collection Fill placed  <br />over the geomembrane and solution collection piping.  <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop  <br />height is 3 feet.  <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying  <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of  <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR  <br />to remove Low Volume Solution Collection Fill to expose the geosynthetics.  <br />CONTRACTOR shall uncover, repair any observed damage of the underlying  <br />geosynthetics, in accordance with the repair requirements of Sections 02776 and  <br />02777 of the SPECIFICATIONS, and recover, at no cost to CC&V.  <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no  <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet  <br />light for more than 180 days.  <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement  <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics.  <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill  <br />to determine compliance with this SPECIFICATION. CONTRACTOR shall record  <br />verification location, elevation, and thickness. CQA MONITOR shall witness all  <br />verification measurements. CONTRACTOR will submit a method of verifying Low  <br />Volume Solution Collection Fill depth to MANAGER for approval. Grade markers shall  <br />be placed on a 50‐ by‐50‐foot grid with additional points required for breaks in grade.  <br />CONTRACTOR shall remove all grade markers under supervision of CQA MONITOR  <br />after verification measurements have been approved by MANAGER and CERTIFYING  <br />ENGINEER and will backfill holes with Low Volume Solution Collection Fill. Areas with  <br />deficient thickness shall be reworked by CONTRACTOR, until acceptable  <br />measurements are obtained. If MANAGER or CERTIFYING ENGINEER suspects the  <br />occurrence of any damage to the underlying geosynthetics, MANAGER will instruct  <br />CONTRACTOR to remove Low Volume Solution Collection Fill to expose the  <br />geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the