My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 13 <br />6. Rubber tired construction equipment shall not be allowed to travel over the <br />geomembrane or on top of Solution Collection piping unless a thickness of at least <br />45 inches of Low Volume Solution Collection Fill has been placed over the <br />geomembrane and on top of Solution Collection piping. The CONTRACTOR will be <br />required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER that the equipment and procedures used are not detrimental to the <br />geomembrane and piping, at no cost to CC&V. Off road haul truck traffic shall require <br />a minimum of 60 inches for Cat 773 (or equivalent) of Low Volume Solution Collection <br />Fill placed over the geomembrane and solution collection piping, and a minimum of <br />120 inches for CAT 777 (or equivalent) of Low Volume Solution Collection Fill placed <br />over the geomembrane and solution collection piping. <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop <br />height is 3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br />to remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />geosynthetics, in accordance with the repair requirements of Sections 02776 and <br />02777 of the SPECIFICATIONS, and recover, at no cost to CC&V. <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet <br />light for more than 180 days. <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics. <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill <br />to determine compliance with this SPECIFICATION. CONTRACTOR shall record <br />verification location, elevation, and thickness. CQA MONITOR shall witness all <br />verification measurements. CONTRACTOR will submit a method of verifying Low <br />Volume Solution Collection Fill depth to MANAGER for approval. Grade markers shall <br />be placed on a 50‐ by‐50‐foot grid with additional points required for breaks in grade. <br />CONTRACTOR shall remove all grade markers under supervision of CQA MONITOR <br />after verification measurements have been approved by MANAGER and CERTIFYING <br />ENGINEER and will backfill holes with Low Volume Solution Collection Fill. Areas with <br />deficient thickness shall be reworked by CONTRACTOR, until acceptable <br />measurements are obtained. If MANAGER or CERTIFYING ENGINEER suspects the <br />occurrence of any damage to the underlying geosynthetics, MANAGER will instruct <br />CONTRACTOR to remove Low Volume Solution Collection Fill to expose the <br />geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the
The URL can be used to link to this page
Your browser does not support the video tag.