Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 12  <br />compactor. The number of passes shall be subject to CERTIFYING ENGINEER's  <br />approval, at no additional cost to CC&V. The method SPECIFICATIONS may be  <br />changed at any time, at the discretion of CERTIFYING ENGINEER, based upon changes  <br />in material characteristics, field conditions, and/or compaction equipment.  <br />E. Leak Detection Fill  <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the  <br />DRAWINGS.  <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not  <br />cause rutting or other deleterious effects.  <br />F. Low Volume Solution Collection Fill  <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the  <br />locations shown on the DRAWINGS.  <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface  <br />that does not cause rutting or other deleterious effects.  <br />3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low Volume  <br />Solution Collection Vertical Riser Pipes in maximum 12‐inch loose lifts and compact  <br />using a hand operated vibratory plate compactor to the satisfaction of the MANAGER  <br />and CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be worked  <br />under the Low Volume Solution Collection Rise pipe haunches by hand to provide  <br />uniform support of the pipe.  <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by  <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles,  <br />or foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the  <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill.  <br />As instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the  <br />satisfaction of MANAGER and CERTIFYING ENGINEER prior to placement of the Low  <br />Volume Solution Collection Fill. In all cases, wrinkles shall not be of a size that they  <br />could fold back on themselves. Wrinkles greater than one foot shall be removed and  <br />repaired by the INSTALLER.  <br />5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36‐inch loose  <br />lift. The tracked equipment shall operate only over previously placed Low Volume  <br />Solution Collection Fill. CONTRACTOR shall not operate equipment directly on  <br />geosynthetics. Only a dozer with a ground pressure not exceeding 14.7 psi can be  <br />used to place Low Volume Solution Collection Fill. Equipment used for placement will  <br />not be allowed to pivot on one track (i.e., no abrupt or sharp turns). There shall be  <br />no downhill placement on slopes steeper than 4H:1V. Material can be placed along  <br />contours if buttressed from below.