My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 12 <br />compactor. The number of passes shall be subject to CERTIFYING ENGINEER's <br />approval, at no additional cost to CC&V. The method SPECIFICATIONS may be <br />changed at any time, at the discretion of CERTIFYING ENGINEER, based upon changes <br />in material characteristics, field conditions, and/or compaction equipment. <br />E. Leak Detection Fill <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not <br />cause rutting or other deleterious effects. <br />F. Low Volume Solution Collection Fill <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the <br />locations shown on the DRAWINGS. <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br />that does not cause rutting or other deleterious effects. <br />3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low Volume <br />Solution Collection Vertical Riser Pipes in maximum 12‐inch loose lifts and compact <br />using a hand operated vibratory plate compactor to the satisfaction of the MANAGER <br />and CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be worked <br />under the Low Volume Solution Collection Rise pipe haunches by hand to provide <br />uniform support of the pipe. <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, <br />or foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill. <br />As instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the <br />satisfaction of MANAGER and CERTIFYING ENGINEER prior to placement of the Low <br />Volume Solution Collection Fill. In all cases, wrinkles shall not be of a size that they <br />could fold back on themselves. Wrinkles greater than one foot shall be removed and <br />repaired by the INSTALLER. <br />5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36‐inch loose <br />lift. The tracked equipment shall operate only over previously placed Low Volume <br />Solution Collection Fill. CONTRACTOR shall not operate equipment directly on <br />geosynthetics. Only a dozer with a ground pressure not exceeding 14.7 psi can be <br />used to place Low Volume Solution Collection Fill. Equipment used for placement will <br />not be allowed to pivot on one track (i.e., no abrupt or sharp turns). There shall be <br />no downhill placement on slopes steeper than 4H:1V. Material can be placed along <br />contours if buttressed from below.
The URL can be used to link to this page
Your browser does not support the video tag.