Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01050 CONSTRUCTION STAKING  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01050 Construction Staking    Page 3  <br />D. The CONTRACTOR will be responsible for performing the following survey activities  <br />associated with the Construction Certification Report:  <br />1. Provide northing, easting, and elevation for all Soil Liner Fill depth verifications.  <br />2. Provide northing, easting, and elevation for geomembrane panel intersections  <br />and destructive samples.  <br />3. Provide continuous northing, easting, and elevation reference for field testing and  <br />sampling location identification.  <br />4. Provide depth verification for the Low Volume Solution Collection Fill on a 50‐foot  <br />by 50‐foot grid with additional points at all grade breaks.  <br />5. Provide depth verification for Drain Cover Fill on a 50‐foot by 50‐foot grid with  <br />additional survey points at all breaks in grade.  <br />6. Provide northing, easting and elevation reference for any underground working  <br />confirmatory drillhole and blasthole locations.  <br />Northings, eastings, and elevations for Items 1, 2, 3 and 6 will be performed on a  <br />daily basis and results will be provided to the MANAGER in both electronic and  <br />hardcopy format within 24 hours of performing the survey.  <br />