Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01050 CONSTRUCTION STAKING  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01050 Construction Staking    Page 2  <br />change in fill or synthetic material type, and any other aspect of the work to facilitate  <br />construction and as required by the MANAGER.  <br />B. Submittals By CONTRACTOR Upon Completion of Work:  <br />Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall  <br />furnish MANAGER with "Record Drawings" (also referred to as "As‐Built Drawings") of  <br />the Work. The Record Drawing will be drawn at a scale of 1‐inch equals 100 feet with 10  <br />foot topographic contour interval, and on a 24‐inch by 36‐inch sheet. All surveying  <br />Record Drawings shall be signed and sealed by the Colorado licensed surveyor who  <br />directed the work.  The required surveying shall be carried out on a 100‐foot by 100‐foot  <br />grid with additional survey points required to define valley leach facility topographic  <br />features (i.e., toe of slope, crest of slope, breaks in grade), unless otherwise directed by  <br />MANAGER. The Record Drawings shall include elevations and locations for the following:  <br /> Leak detection trench plan view showing the limits of the valley leach facility, leak  <br />detection trench alignment, and leak detection sumps, with elevations every  <br />approximately 100‐feet  <br /> Soil Liner Fill plan view showing the limits of the valley leach facility,  with contours of  <br />the Soil Liner Fill and Bedding Fill surface on a 10‐foot contour interval, including the  <br />regraded ore slopes and end berms  <br /> Low Volume Solution Collection piping plan showing the limits of the composite liner,  <br />double liner and single liner, and piping alignment with elevations every  <br />approximately 100 feet  <br /> Perimeter access roads  <br /> Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the  <br />Vertical Riser Sump and base plates  <br /> High Volume Solution Collection piping plan showing the limits of the VLF, and piping  <br />alignment with elevation every approximately 100‐feet  <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be  <br />submitted in the Construction Certification Report.  <br />C. Submittal  <br />CONTRACTOR will submit completed as‐built documentation within seven (7)  <br />calendar days upon completion of the work in the following manner:  <br />1. Submit two (2) hard copies to the MANAGER.  <br />2. Submit two (2) non‐reproducible copies to the MANAGER in electronic form on  <br />compact disks (CD) or DVD’s and in an AutoCAD compatible format.