Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01050 CONSTRUCTION STAKING  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01050 Construction Staking    Page 1  <br />SECTION 01050 CONSTRUCTION STAKING AND CONSTRUCTION DOCUMENTATION  <br />1. PART 1: GENERAL  <br />1.1. Summary  <br />This Section defines the control staking services required by the CONTRACTOR. All staking and  <br />surveying will be the responsibility of the CONTRACTOR unless otherwise specifically defined in  <br />this section. All grade checking and transferring of lines and grades from CC&V’s stakes will be  <br />the CONTRACTOR'S responsibility.  <br />1.2. Control Stakes  <br />Control stakes which are reference points for all construction work will be conspicuously marked.  <br />It shall be the responsibility of the CONTRACTOR to inform his employees and his subcontractors  <br />of their importance and the necessity for their preservation. At least forty‐eight (48) hours  <br />written advance request for removal of control stakes shall be given to CC&V. A total of ten (10)  <br />control stakes will be provided to the CONTRACTOR by CC&V for this work.  <br />Control stakes shall be set one time only.  <br />1.3. Flagging Code  <br />A color code will be established by the CONTRACTOR during the course of the project indicating  <br />specific colors for the various kinds of stakes to be set.  <br />1.4. Staking  <br />A. CC&V will provide vertical and horizontal reference control stakes in the proximity of the  <br />work as discussed in Section 1.2 of this SPECIFICATION.  <br />B. The CONTRACTOR shall be responsible for setting construction and grade stakes and for  <br />proper preservation of control points.  <br />C. The CONTRACTOR will provide as‐built coordinates and elevations for the Leak Detection  <br />system, Low Volume Solution Collection piping and High Volume Solution Collection  <br />piping or as requested by the MANAGER.  <br />1.5. Construction Certification Documentation  <br />A. The CONTRACTOR shall be responsible for accurately surveying the locations and  <br />elevations, and where applicable, the type, thickness, and geometry of any and all pipes  <br />and fittings, ditches, geosynthetic materials, breaks in fill or cut slopes, general grading,