My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 5 <br />8. Select Drain Cover Fill ‐ material approved by MANAGER and CERTIFYING ENGINEER <br />conforming to the following specification: <br /> <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />1½‐inch 100 <br />¾‐inch 70 – 100 <br />No. 4 5 – 55 <br />No. 200 0 – 10 <br />Plasticity Index: NP <br /> <br />Acceptance of non‐conforming materials: In cases where non‐conformance to these material <br />specifications occur the Design Engineer in tandem with the Manager can approve the material <br />for use, if in their opinion, the specification deviation does not diminish functionality of a given <br />design element and/or compromise the design intent. If non‐conforming materials are accepted <br />by the Design Engineer and Manager for use during construction, the DRMS will be contacted, <br />within a week of discovery, to alert them to the acceptance and rationale behind acceptance of <br />non‐conforming materials. <br />3. PART 3: EXECUTION <br />3.1. Clearing and Grubbing <br />A. Clearing and grubbing shall be done within the footprint of the limits of the construction <br />area, as delineated on the DRAWINGS. Clearing shall extend a maximum of 15 feet and a <br />minimum of 10 feet outside of the construction limits or as directed by MANAGER. Areas <br />for clearing shall be released to CONTRACTOR by MANAGER. No pioneering of roads <br />across undisturbed areas shall be allowed without prior approval of MANAGER <br />B. No clearing shall be performed until written permission is given by MANAGER and until <br />the CONTRACTOR has provided construction staking for the proposed work. Clearing shall <br />consist of cutting brush to the ground level, removing such material, along with wood, <br />rubbish, tree stumps, and any other vegetation with roots in excess of 1‐inch diameter, <br />and other deleterious materials, and disposing of all such material in the accepted manner <br />described below. <br />C. In areas designated to be stripped of unsuitable or objectionable material, said materials <br />shall be stripped to the full depth of organic or other unsuitable material as determined <br />by MANAGER and CERTIFYING ENGINEER, whichever is greater. <br />D. Stripped and grubbed vegetation shall be removed and disposed in stockpiles or other <br />approved methods in an area designated by MANAGER.
The URL can be used to link to this page
Your browser does not support the video tag.