Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 4  <br />6. Soil Liner Fill ‐ processed materials as approved by MANAGER and CERTIFYING  <br />ENGINEER, conforming to the following specification:  <br />  <br />U.S. Standard   <br />Sieve Size  <br />Percent Passing   <br />by Dry Weight  <br />2‐inch 100  <br />No. 200 15 – 65  <br />Point load tensile strength: > 300 psi  <br />Plasticity Index: 10  <br />Minimum Hydraulic Conductivity 1×10‐6 cm/s maximum  <br />  <br />7. Drain Cover Fill ‐ material approved by MANAGER and CERTIFYING ENGINEER  <br />conforming to the following specification:  <br />  <br />U.S. Standard   <br />Sieve Size  <br />Percent Passing   <br />by Dry Weight  <br />1½‐inch 100  <br />¾‐inch 70 – 100  <br />No. 4 5 – 55  <br />No. 200 0 – 10  <br />Plasticity Index: NP  <br />  <br />Upon approval by the CERTYIFYING ENGINEER, spent ore (within the above  <br />SPECIFICATIONS) from Phase IV of VLF1 may be used as Drain Cover Fill.  <br />or  <br />The MANAGER substitute crushed ore as Drain Cover Fill. The crushed ore material  <br />shall conform to the following SPECIFICATIONS:   <br />  <br />U.S. Standard   <br />Sieve Size  <br />Percent Passing   <br />by Dry Weight  <br />3‐inch 100  <br />2‐inch 97 ‐ 100  <br />¾‐inch 40 – 100  <br />No. 4 5 – 35  <br />No. 200 0 – 8  <br />Plasticity Index:  Non Plastic