Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 3  <br />2. Structural Fill ‐ material as approved by MANAGER and CERTIFYING ENGINEER  <br />conforming to the following specification:  <br />U.S. Standard  <br />Sieve Size  <br />Percent Passing  <br />by Dry Weight  <br />24‐inch 100  <br />8‐inch 40 – 100  <br />No. 200 0 – 25  <br />Plasticity Index: 30 maximum  <br />  <br />3. Select Structural Fill ‐ well graded granular soil or sound, hard, durable, rockfill  <br />excavated on‐site or supplied from off‐site mine waste rock with a maximum particle  <br />size of 3 inches as approved by MANAGER and CERTIFYING ENGINEER.  <br />4. Leak Detection Fill ‐ material approved by MANAGER and CERTIFYING ENGINEER  <br />conforming to the following specification:  <br />  <br />U.S. Standard  <br />Sieve Size  <br />Percent Passing  <br />by Dry Weight  <br />1‐inch 100  <br />⅜‐inch 40 – 70  <br />No. 4 5 – 50  <br />No. 40 0 – 20  <br />No. 200 0 – 10  <br />Plasticity Index: NP  <br />  <br />5. Low Volume Solution Collection Fill ‐ material approved by MANAGER and  <br />CERTIFYING ENGINEER conforming to the following specification:  <br />  <br />U.S. Standard  <br />Sieve Size  <br />Percent Passing  <br />by Dry Weight  <br />1‐inch 100  <br />⅜‐inch 40 – 70  <br />No. 4 5 – 55  <br />No. 200 0 – 10  <br />Plasticity Index: NP  <br />  <br />