My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 2 <br />1.4. Quality Assurance <br />A. All work shall be monitored and tested in compliance with the requirements of the CQA <br />Plan. <br />B. CONTRACTOR shall be aware of all testing activities outlined in the CQA Plan, and shall <br />account for these activities in the construction schedule. <br />C. All CQA soils testing (both field and laboratory testing) will be the responsibility of <br />CERTIFYING ENGINEER, as identified in the Earthworks CQA plan. CONTRACTOR shall be <br />responsible for cooperating with CQA MONITOR during all testing activities. <br />CONTRACTOR shall provide equipment and labor to assist CQA MONITOR in sampling, if <br />requested, and shall also provide access to all areas requiring testing activities. Quality <br />Control testing shall be the responsibility of the CONTRACTOR. <br />D. All excavation, backfill, and grading operations shall be carried out under the observation <br />of MANAGER and CERTIFYING ENGINEER. <br />E. Any work found unsatisfactory, or any work disturbed by subsequent operations before <br />acceptance is granted shall be corrected by CONTRACTOR, at its sole cost. <br />2. PART 2: PRODUCTS <br />2.1. Materials <br />A. Fill materials will be soils, gravels, or rock fill approved by MANAGER and CERTIFYING <br />ENGINEER. The materials shall be free of organic matter, debris, frozen material, and <br />other deleterious materials, and shall be excavated, as required, as follows: <br />1. Overburden Fill – material as approved by the MANAGER and CERTIFYING ENGINEER <br />conforming to the following specifications: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />60‐inch 100 <br />36‐inch 80 – 100 <br />3‐inch 40 – 100 <br />Plasticity Index: 30 maximum <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.