Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 1  <br />SECTION 02200 EARTHWORKS  <br />1. PART 1:  GENERAL  <br />1.1. Summary  <br />This specification describes site preparation, excavation, stockpiling of soils for earthwork if  <br />necessary, and placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Low  <br />Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Select Drain Cover  <br />Fill, Fine Shaft Backfill, Pipe Bedding Material, and Granular Filter Material for the valley leach  <br />facility.  <br />1.2. Related Sections  <br />Refer to the following Sections for related work:  <br /> Section 01050 ‐ Staking and Construction Certification Documentation  <br /> Section 02776‐0 ‐ Geomembrane  <br /> Section 02777 ‐ Geotextile  <br />1.3. Tolerances  <br />A. Limits of excavation, Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Low Volume  <br />Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover Fill,  <br />Select Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material, and Granular Filter  <br />Material for the valley leach facility are defined by the lines and elevations shown on the  <br />DRAWINGS. All fills shall be placed to the minimum thicknesses shown on the DRAWINGS.  <br />B. Finished grades shown on the DRAWINGS are given in feet and shall slope uniformly  <br />between given spot and contour elevations, without sag or humps. All grades shall  <br />provide for natural runoff.  <br />C. The Soil Liner Fill and Bedding Fill shall have a minimum thickness of 1.0 foot.  <br />D. The Low Volume Solution Collection Fill will have a minimum thickness of 3.0 feet at all  <br />times while the Drain Cover fill and Select Drain Cover Fill will have a minimum thickness  <br />of 2.0 feet at all times.  <br />E. Clearance of pipes with respect to regulated boundaries will be checked by MANAGER. If  <br />clearances are inadequate, CONTRACTOR shall backfill trenches to compaction  <br />SPECIFICATIONS and relocate trenches at CONTRACTOR's expense.  <br />F. Correction of over‐excavation and backfilling shall be to CONTRACTOR's account.