My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200 EARTHWORKS <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 02200 Earthworks Page 6 <br />3.2. Topsoil Removal <br />Topsoil is defined as an acceptable growth medium as approved by MANAGER and CERTIFYING <br />ENGINEER that has no chemical or physical characteristics, which will exclude its use as such. <br />A. Stripping of the topsoil shall be done within the entire area of the stripping limits. <br />B. CONTRACTOR shall excavate and remove topsoil in a manner that will minimize <br />contamination with other soil horizons and will take such measures as are necessary to <br />ensure that the removal of topsoil does not result in erosion or excessive sedimentation. <br />C. CONTRACTOR shall stockpile topsoil at locations designated by MANAGER. Stored topsoil <br />shall not be disturbed by mining, leaching operations, or construction activities, and shall <br />be protected from wind and water erosion, compaction, and contamination. <br />D. CONTRACTOR shall grade topsoil stockpiles to prevent erosion and ponding of <br />precipitation in the stockpile areas. The maximum topsoil stockpile height will be <br />approved by MANAGER. The CONTRACTOR shall protect stockpiled topsoil by an effective <br />cover of non‐noxious, quick‐ growing, annual, and perennial plants, approved by <br />MANAGER, which shall be seeded or planted during the first appropriate growing season <br />after removal. <br />3.3. Waste Removal <br />Waste material is defined as material too wet, too dry, frozen or containing ice or snow, <br />containing organic or other deleterious matter, having poor characteristics of grading or <br />compaction, having other characteristics that may result in undesirable settlement or other <br />movement of the fill, or within the fill, or otherwise not meeting the requirements of the <br />SPECIFICATIONS, provided that this definition permits drying, water, and any other processing or <br />reprocessing to make the material stable and suitable prior to incorporating it into the fill as <br />permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER. <br />A. CONTRACTOR shall excavate and remove waste in a manner that will minimize <br />contamination with other soil horizons. <br />B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER <br />3.4. Excavation <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS <br />or as directed by MANAGER. No excavation shall begin until the CONTRACTOR has <br />provided construction staking for the proposed work. <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. <br />Where selective excavations are required to obtain materials for Structural Fill and Select <br />Structural Fill, the material removed from the excavations shall be taken directly to the
The URL can be used to link to this page
Your browser does not support the video tag.