Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200 EARTHWORKS  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02200 Earthworks    Page 6  <br />3.2. Topsoil Removal  <br />Topsoil is defined as an acceptable growth medium as approved by MANAGER and CERTIFYING  <br />ENGINEER that has no chemical or physical characteristics, which will exclude its use as such.  <br />A. Stripping of the topsoil shall be done within the entire area of the stripping limits.  <br />B. CONTRACTOR shall excavate and remove topsoil in a manner that will minimize  <br />contamination with other soil horizons and will take such measures as are necessary to  <br />ensure that the removal of topsoil does not result in erosion or excessive sedimentation.  <br />C. CONTRACTOR shall stockpile topsoil at locations designated by MANAGER.  Stored topsoil  <br />shall not be disturbed by mining, leaching operations, or construction activities, and shall  <br />be protected from wind and water erosion, compaction, and contamination.  <br />D. CONTRACTOR shall grade topsoil stockpiles to prevent erosion and ponding of  <br />precipitation in the stockpile areas. The maximum topsoil stockpile height will be  <br />approved by MANAGER. The CONTRACTOR shall protect stockpiled topsoil by an effective  <br />cover of non‐noxious, quick‐ growing, annual, and perennial plants, approved by  <br />MANAGER, which shall be seeded or planted during the first appropriate growing season  <br />after removal.  <br />3.3. Waste Removal  <br />Waste material is defined as material too wet, too dry, frozen or containing ice or snow,  <br />containing organic or other deleterious matter, having poor characteristics of grading or  <br />compaction, having other characteristics that may result in undesirable settlement or other  <br />movement of the fill, or within the fill, or otherwise not meeting the requirements of the  <br />SPECIFICATIONS, provided that this definition permits drying, water, and any other processing or  <br />reprocessing to make the material stable and suitable prior to incorporating it into the fill as  <br />permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER.  <br />A. CONTRACTOR shall excavate and remove waste in a manner that will minimize  <br />contamination with other soil horizons.  <br />B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER  <br />3.4. Excavation  <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS  <br />or as directed by MANAGER. No excavation shall begin until the CONTRACTOR has  <br />provided construction staking for the proposed work.  <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation.  <br />Where selective excavations are required to obtain materials for Structural Fill and Select  <br />Structural Fill, the material removed from the excavations shall be taken directly to the