Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 10  <br />6.3.2. Geotextile  <br />During geotextile installation, the CQA MONITOR shall observe and document deployment,  <br />field seaming, and repairs to assure that the installation is in compliance with the  <br />SPECIFICATIONS.  <br />Deployment ‐ The CQA MONITOR shall verify that the subgrade is free of deleterious  <br />materials prior to deployment, anchoring is achieved as specified, specified methods are used  <br />to minimize wrinkles and protect underlying layers during cutting of materials, and deployment  <br />procedures are performed in compliance with the project SPECIFICATIONS.  <br />Seams ‐ The CQA MONITOR shall verify sufficient overlap and that the specified seam  <br />procedures were followed in compliance with the project SPECIFICATIONS.  <br />Repairs ‐ The CQA MONITOR shall verify that all repairs are performed in compliance with  <br />SPECIFICATIONS.  <br />Protection – The CQA MONITOR shall observe and document that all soil materials placed on  <br />top of the geosynthetics are done in such a manner as to ensure that the geosynthetics and  <br />underlying materials are not damaged.    <br />6.4. Polyethylene Pipe and Fittings  <br />During polyethylene pipe installation, the CQA MONITOR shall observe and document that the  <br />installation is in compliance with the project SPECIFICATIONS. CQA monitoring of the  <br />polyethylene pipe and fittings will include the following:  <br />Placement ‐ Observation that the handling procedures used do not damage the pipe, backfill is  <br />placed in compliance with the requirements of the project SPECIFICATIONS so as not to damage  <br />the pipe, any foreign material is removed from the interior of the pipe and indentations on the  <br />pipe are within the MANUFACTURER's allowable limits.  <br />Joints and Connections ‐ Monitoring of the jointing and connection operations to verify that  <br />the CONTRACTOR follows the SPECIFICATIONS and the pipe MANUFACTURER's  <br />recommendations, verification that the pipes are clean when installed, that perforated  <br />sections of pipe are aligned properly prior to connection, pipe boot connections are made in  <br />the field using the specified rings and clamps, and plastic ties are used to connect the  <br />secondary perforated pipes to primary perforated pipes.  <br />Nondestructive Testing ‐ Observe any required testing of the pipe to verify compliance with  <br />the project SPECIFICATIONS.