My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 01400‐2 Geosynthetics CQA Page 9 <br />properly and that test procedures are in compliance with the project SPECIFICATIONS. The <br />CQA MONITOR shall verify that all seams and repairs with failing test results are repaired <br />and/or re‐tested until passing results are achieved. The CQA MONITOR shall record all non‐ <br />destructive test locations on the vacuum test and pressure test log forms. <br />Destructive Seam Testing ‐ The INSTALLER shall obtain samples, at locations selected by the <br />CQA MONITOR, of the field seamed geomembrane approximately 24 inches along and 12 <br />inches across the seam and centered over the seam as follows: <br /> a minimum of one sample per day; <br /> a minimum of one sample for each geomembrane seamer; <br /> a minimum of one sample every 500 feet of seaming; and <br /> seams that appear suspect to the CQA MONITOR. <br />The CQA MONITOR shall witness the testing of destructive seam samples by the INSTALLER. <br />The INSTALLER shall mark all samples with their roll and seam number, date, machine number, <br />welding technician identification, extruder and nozzle/wedge temperature, and ambient air <br />temperature. <br />The INSTALLER shall test all destructive samples in compliance with the project <br />SPECIFICATIONS. <br />The INSTALLER shall be responsible for patching all areas cut for test samples in accordance <br />with the SPECIFICATIONS and MANUFACTURER's requirements and performing non‐ <br />destructive testing (i.e., vacuum box) of the seams. The CQA MONITOR shall record test <br />locations on the geomembrane defect log forms. Additional testing information will be <br />recorded on the geomembrane seam destructive sample log form. The CQA MONITOR shall <br />track failing tests as described in the SPECIFICATIONS. <br />Repairs ‐ The CQA MONITOR shall observe and document that all repair materials, techniques, <br />and procedures used for repairs are approved in advance and meet the requirements of the <br />project SPECIFICATIONS. The CQA MONITOR shall verify that all defects and repairs are <br />marked, recorded, repaired, tested, and wrinkles are addressed, prior to being covered by <br />other materials; and that repairs are performed as specified, including proper patch size or <br />dimension. The CQA MONITOR shall record defects and repairs on the defect and repair log <br />forms.
The URL can be used to link to this page
Your browser does not support the video tag.