My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 01400‐2 Geosynthetics CQA Page 8 <br /> observe and document that all soil materials placed on top of the geosynthetics are done <br />in such a manner as to ensure that the geosynthetics are not damaged. <br />6.3.1. Geomembrane <br />During geomembrane installation, the CQA MONITOR shall observe and document <br />deployment, trial seams, field seaming, non‐destructive and destructive seam testing, and <br />repairs to assure that the installation is in compliance with the SPECIFICATIONS. <br />Deployment ‐ The CQA MONITOR shall verify that only approved materials are used, each <br />panel is given a unique panel number, no geomembrane is placed during unsuitable weather <br />conditions as outlined in SPECIFICATION Section 02776, Section 1.5, the geomembrane is not <br />damaged during installation, and anchoring is performed in compliance with the <br />SPECIFICATIONS and design DRAWINGS. The CQA MONITOR shall record the deployment on <br />the deployment log form. <br />Trial Seams ‐ The CQA MONITOR shall verify that seaming conditions are performed in <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test <br />procedures are followed, and retests are performed in compliance with the SPECIFICATIONS. If <br />the ambient air temperature measured by the CQA MONITOR is above 35°F for the entire <br />day, the INSTALLER shall perform trial seams at the beginning of each crew shift, and <br />immediately following any work stoppage (i.e., for lunch, weather conditions, etc.) of for more <br />than 30 minutes or at the discretion of the CERTIFYING ENGINEER, for each seaming apparatus <br />used that day. If the ambient air temperature measured by the CQA MONITOR is below 35°F <br />for the entire day, the INSTALLER shall perform four (4) trial seams, at approximately the same <br />time interval throughout the scheduled work day. Each Seamer shall make at least one trial <br />seam each day. Seaming operation shall not commence until the CQA MONITOR has <br />determined that the seaming process is meeting the SPECIFICATION requirement and is <br />acceptable. The CQA MONITOR shall record the trial weld results on the trial seam log form. <br />Field Seaming ‐ The CQA MONITOR shall verify that only approved equipment and <br />personnel perform welding, all welding is performed under suitable conditions as specified <br />in the project SPECIFICATIONS, specified overlaps are achieved, seams are oriented in <br />compliance to project requirements, and that grinding techniques and extrudate meet project <br />requirements for extrusion welding. The CQA MONITOR shall record all field seaming on field <br />seaming log forms. <br />Non‐Destructive Seam Continuity Testing ‐ The CQA MONITOR shall verify that all seams and <br />repair are non‐destructively tested in compliance with the project SPECIFICATIONS. If a seam <br />cannot be tested, the seam shall be capped. The CQA MONITOR shall observe capping <br />operations. The CQA MONITOR shall verify that test equipment and gauges are functioning
The URL can be used to link to this page
Your browser does not support the video tag.