Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 8  <br /> observe and document that all soil materials placed on top of the geosynthetics are done  <br />in such a manner as to ensure that the geosynthetics are not damaged.  <br />6.3.1. Geomembrane  <br />During geomembrane installation, the CQA MONITOR shall observe and document  <br />deployment, trial seams, field seaming, non‐destructive and destructive seam testing, and  <br />repairs to assure that the installation is in compliance with the SPECIFICATIONS.  <br />Deployment ‐ The CQA MONITOR shall verify that only approved materials are used, each  <br />panel is given a unique panel number, no geomembrane is placed during unsuitable weather  <br />conditions as outlined in SPECIFICATION Section 02776, Section 1.5, the geomembrane is not  <br />damaged during installation, and anchoring is performed in compliance with the  <br />SPECIFICATIONS and design DRAWINGS. The CQA MONITOR shall record the deployment on  <br />the deployment log form.  <br />Trial Seams ‐ The CQA MONITOR shall verify that seaming conditions are performed in  <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test  <br />procedures are followed, and retests are performed in compliance with the SPECIFICATIONS. If  <br />the ambient air temperature measured by the CQA MONITOR is above 35°F for the entire  <br />day, the INSTALLER shall perform trial seams at the beginning of each crew shift, and  <br />immediately following any work stoppage (i.e., for lunch, weather conditions, etc.) of for more  <br />than 30 minutes or at the discretion of the CERTIFYING ENGINEER, for each seaming apparatus  <br />used that day. If the ambient air temperature measured by the CQA MONITOR is below 35°F  <br />for the entire day, the INSTALLER shall perform four (4) trial seams, at approximately the same  <br />time interval throughout the scheduled work day. Each Seamer shall make at least one trial  <br />seam each day. Seaming operation shall not commence until the CQA MONITOR has  <br />determined that the seaming process is meeting the SPECIFICATION requirement and is  <br />acceptable. The CQA MONITOR shall record the trial weld results on the trial seam log form.  <br />Field Seaming ‐ The CQA MONITOR shall verify that only approved equipment and  <br />personnel perform welding, all welding is performed under suitable conditions as specified  <br />in the project SPECIFICATIONS, specified overlaps are achieved, seams are oriented in  <br />compliance to project requirements, and that grinding techniques and extrudate meet project  <br />requirements for extrusion welding.  The CQA MONITOR shall record all field seaming on field  <br />seaming log forms.  <br />Non‐Destructive Seam Continuity Testing ‐ The CQA MONITOR shall verify that all seams and  <br />repair are non‐destructively tested in compliance with the project SPECIFICATIONS. If a seam  <br />cannot be tested, the seam shall be capped. The CQA MONITOR shall observe capping  <br />operations. The CQA MONITOR shall verify that test equipment and gauges are functioning