Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 7  <br />forward the sample to a third party geosynthetic laboratory. As a minimum, the following  <br />conformance tests shall be conducted; with project requirements outlined in Section 02776,  <br />Section 2.1:  <br /> Geomembrane: density (ASTM D1505/ASTM D792)  <br />carbon black content (ASTM D4218)   <br />thickness (ASTM D5199/ASTM D5994)  <br />tensile strength (ASTM D6693)  <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS.  <br />The CQA MONITOR shall review the test results and shall report any nonconformance to  <br />the MANAGER, CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR.  <br />6.3. Construction Monitoring and Testing  <br />The CQA MONITOR shall monitor and test all geosynthetic components of the construction to  <br />verify that the construction is in compliance with the project SPECIFICATIONS. The CQA  <br />MONITOR shall identify inadequate construction methodologies or materials which may  <br />adversely impact the performance of the facility being constructed and existing structures.  <br />Visual observations throughout the construction process shall be made to ensure that the  <br />materials are placed to the lines and grades as shown on the DRAWINGS.  <br />The CQA MONITOR shall review the following submittals by INSTALLER during the project:  <br /> verification that a qualified land surveyor has verified all lines and grades; and  <br /> subgrade surface acceptance certificates for each area to be covered by the lining  <br />system, signed by the INSTALLER.  <br />The CQA MONITOR shall:  <br /> Inspect all geosynthetic materials delivered to site. The CQA MONITOR shall document  <br />any damage and notify MANAGER;  <br /> obtain geosynthetic packaging identification slips for verification and generation of an on‐ <br />site materials inventory;  <br /> observe subgrade conditions prior to geosynthetics installation and verify that any  <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected;  <br /> observe permanent anchoring of geosynthetics to verify that design and project  <br />SPECIFICATIONS are met;  observe that required overlap distances are met;  <br /> monitor and record ambient air temperatures;  <br /> verify that no continuous horizontal seams are placed on slopes unless approved by  <br /> CERTIFYING ENGINEER; and