My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 01400‐2 Geosynthetics CQA Page 7 <br />forward the sample to a third party geosynthetic laboratory. As a minimum, the following <br />conformance tests shall be conducted; with project requirements outlined in Section 02776, <br />Section 2.1: <br /> Geomembrane: density (ASTM D1505/ASTM D792) <br />carbon black content (ASTM D4218) <br />thickness (ASTM D5199/ASTM D5994) <br />tensile strength (ASTM D6693) <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. <br />The CQA MONITOR shall review the test results and shall report any nonconformance to <br />the MANAGER, CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br />6.3. Construction Monitoring and Testing <br />The CQA MONITOR shall monitor and test all geosynthetic components of the construction to <br />verify that the construction is in compliance with the project SPECIFICATIONS. The CQA <br />MONITOR shall identify inadequate construction methodologies or materials which may <br />adversely impact the performance of the facility being constructed and existing structures. <br />Visual observations throughout the construction process shall be made to ensure that the <br />materials are placed to the lines and grades as shown on the DRAWINGS. <br />The CQA MONITOR shall review the following submittals by INSTALLER during the project: <br /> verification that a qualified land surveyor has verified all lines and grades; and <br /> subgrade surface acceptance certificates for each area to be covered by the lining <br />system, signed by the INSTALLER. <br />The CQA MONITOR shall: <br /> Inspect all geosynthetic materials delivered to site. The CQA MONITOR shall document <br />any damage and notify MANAGER; <br /> obtain geosynthetic packaging identification slips for verification and generation of an on‐ <br />site materials inventory; <br /> observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br /> observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; observe that required overlap distances are met; <br /> monitor and record ambient air temperatures; <br /> verify that no continuous horizontal seams are placed on slopes unless approved by <br /> CERTIFYING ENGINEER; and
The URL can be used to link to this page
Your browser does not support the video tag.