Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 6  <br /> discuss any problems or potential construction problems.  <br /> This meeting will be documented by the CQA MONITOR.  <br />5.3. Deficiency Meetings  <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a  <br />minimum, these meetings will be attended by the CQA MONITOR and INSTALLER or  <br />CONTRACTOR. If the problem relates to a design issue, the MANAGER, DESIGN ENGINEER  <br />and CERTIFYING ENGINEER should also be present.  The meeting will be documented by the  <br />CQA MONITOR.  <br />6. PART 6: GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE  <br />Construction of the valley leach facility or specified geosynthetics must be in compliance with  <br />the design plans and SPECIFICATIONS. CC&V shall implement a CQA monitoring and testing  <br />program to ensure construction compliance by the CONTRACTOR. The quality assurance  <br />program shall consist of reviewing CONTRACTOR quality control submittals, material  <br />conformance testing, and construction monitoring and testing.  <br />The types of geosynthetics used in the valley leach facility construction include polyethylene  <br />pipe, geomembrane and geotextile. These geosynthetics are defined in the project  <br />SPECIFICATIONS. Prior to and during construction, these geosynthetics shall be sampled and  <br />tested to determine if they meet project SPECIFICATIONS. All tests shall be performed in a  <br />geosynthetics laboratory approved by the MANAGER and CERTIFYING ENGINEER.  <br />6.1. Review Quality Control Submittals  <br />Prior to geosynthetic installation, the CQA MONITOR shall review the INSTALLER'S quality  <br />control submittals to evaluate or confirm that these materials meet project requirements. The  <br />CQA MONITOR shall review the QC submittals that are outlined in Section 02776  <br />(Geomembrane) and Section 02777 (Geotextile) of the SPECIFICATIONS.    <br />6.2. Geomembrane Conformance Testing  <br />Prior to geosynthetic installation, the CQA MONITOR shall obtain samples of the  <br />geomembrane for conformance testing to confirm that these materials meet project  <br />requirements. The conformance testing frequency shall be at a rate of 1 test per 150,000  <br />square feet. Samples shall be taken across the entire width of the roll and shall not include the  <br />first 3 feet. The samples shall be 3 feet wide by the roll width.  The CQA MONITOR shall mark  <br />the machine direction, roll number on the sample, and date the sample was obtained and