Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 11  <br />7. PART 7: DOCUMENTATION  <br />Documentation kept by the CQA MONITOR shall consist of daily record‐keeping,  <br />documentation of construction problem resolutions, documentation of design and  <br />SPECIFICATION changes, photographic records, weekly progress reports, chain of custody  <br />forms for test sample tracking, and a Construction Certification Report.  <br />7.1. Daily Record Keeping  <br />The CQA MONITOR shall keep daily records consisting of field notes, observation and testing  <br />data sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting  <br />of construction problems and resolutions. This information shall be submitted on a regular  <br />basis to the MANAGER for review.  <br />7.2. Geosynthetic Observation and Testing Forms  <br />The CQA MONITOR shall document geosynthetic observations and test results on forms  <br />which include the following information:  <br /> date, project name, location, and weather data;  <br /> identification of panel or seam numbers;  <br /> description of ongoing construction, detailing deployment areas;  <br /> numbering system identifying test or sample number;  <br /> location and identification of repairs and date of repair;  <br /> length and/or thickness measurements for geomembrane panels or seams;  <br /> welding machine temperatures and settings;    <br /> welding machine and technician identifications;  <br /> location of tests and test results;  <br /> identification of testing technicians and time of tests; and  <br /> signature or initials of the CQA MONITOR.  <br />7.3. Photo Documentation  <br />The CQA MONITOR shall photograph all phases of construction.  <br />7.4. Design and Specification Changes  <br />During construction, the need to address design and SPECIFICATION changes, modifications, or  <br />clarifications may arise. In such cases the CQA MONITOR shall notify the MANAGER, which  <br />will notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION