My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 01400‐2 Geosynthetics CQA Page 11 <br />7. PART 7: DOCUMENTATION <br />Documentation kept by the CQA MONITOR shall consist of daily record‐keeping, <br />documentation of construction problem resolutions, documentation of design and <br />SPECIFICATION changes, photographic records, weekly progress reports, chain of custody <br />forms for test sample tracking, and a Construction Certification Report. <br />7.1. Daily Record Keeping <br />The CQA MONITOR shall keep daily records consisting of field notes, observation and testing <br />data sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting <br />of construction problems and resolutions. This information shall be submitted on a regular <br />basis to the MANAGER for review. <br />7.2. Geosynthetic Observation and Testing Forms <br />The CQA MONITOR shall document geosynthetic observations and test results on forms <br />which include the following information: <br /> date, project name, location, and weather data; <br /> identification of panel or seam numbers; <br /> description of ongoing construction, detailing deployment areas; <br /> numbering system identifying test or sample number; <br /> location and identification of repairs and date of repair; <br /> length and/or thickness measurements for geomembrane panels or seams; <br /> welding machine temperatures and settings; <br /> welding machine and technician identifications; <br /> location of tests and test results; <br /> identification of testing technicians and time of tests; and <br /> signature or initials of the CQA MONITOR. <br />7.3. Photo Documentation <br />The CQA MONITOR shall photograph all phases of construction. <br />7.4. Design and Specification Changes <br />During construction, the need to address design and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA MONITOR shall notify the MANAGER, which <br />will notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION
The URL can be used to link to this page
Your browser does not support the video tag.