Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 3  <br />with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER will be  <br />responsible for the resolution of all quality assurance issues.  <br />2.5. Construction Quality Assurance Monitor  <br />The Construction Quality Assurance Monitor, also referred to as the "CQA MONITOR ", is  <br />the firm or individual responsible for performing the CQA tasks outlined in this plan. The CQA  <br />MONITOR is the official CQA representative of CC&V and has the responsibility of overseeing  <br />the CQA aspects of the project. In this CQA Plan the CQA MONITOR is associated with the  <br />CERTIFYING ENGINEER and refers specifically to (To Be Determined). The CQA MONITOR has  <br />the authority to stop any aspect of the work that is not in compliance with the CQA Plan.  <br />Work would then be resumed once corrective action has been approved by the MANAGER  <br />and CERTIFYING ENGINEER. The specific responsibilities of the CQA MONITOR include:  <br /> review the design DRAWINGS, project SPECIFICATIONS, and related guidance documents;  <br /> review all CONTRACTOR QC submittals and make appropriate recommendations;  <br /> observe geosynthetic material delivery, unloading, and storage;   <br /> obtain and test geosynthetic conformance samples during geosynthetics manufacture;  <br /> observe prepared subgrade prior to geosynthetic deployment;  <br /> monitor and document geosynthetic material placement, trial seam testing, non‐ <br />destructive testing, seaming and repair operations, and destructive testing;  <br /> identify seam samples for CQA destructive testing;  <br /> assure that testing equipment used, and tests performed are conducted according to  <br />project SPECIFICATIONS and industry standards;  <br /> perform or observe, document, and report test results to MANAGER as required;  <br /> report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA  <br />MONITOR, including design or project SPECIFICATION changes; and  <br /> prepare a Construction Certification Report describing the construction, any deviations  <br />from SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory  <br />details, subgrade acceptance forms, test data, tests results (both laboratory and field), QC  <br />submittals, geomembrane panel layout as‐built prepared by the CQA MONITOR,  <br />professional certification that construction was completed in compliance with the  <br />DRAWINGS and SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING  <br />ENGINEER registered in the State of Colorado.  <br />2.6. Geosynthetics Manufacturer  <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for  <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER