Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2 GEOSYNTHETICS CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400‐2 Geosynthetics CQA    Page 4  <br />must verify prior to construction that the MANUFACTURER can produce material that meets  <br />the requirements outlined in project SPECIFICATIONS.  <br />2.7. Geosynthetics Installation Contractor  <br />The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or  <br />"INSTALLER", is responsible for installation of the geosynthetic components, as outlined in the  <br />project SPECIFICATIONS.  <br />The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS.  <br />The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane  <br />anchoring, seaming, repairs and non‐destructive testing, in accordance with the project plans,  <br />SPECIFICATIONS and the Installer’s internal quality control program. It is the INSTALLER’s  <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS.  <br />2.8. Earthworks Contractor  <br />The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper  <br />delivery and placement of earthwork components as outlined in the project SPECIFICATIONS.    <br />3. PART 3: LINES OF COMMUNICATION  <br />The CQA MONITOR shall be capable of direct communication with the MANAGER, DESIGN  <br />ENGINEER, CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can be  <br />easily remedied, such as unsatisfactory test results, will be dealt with directly between the  <br />CQA MONITOR, INSTALLER, and/or CONTRACTORS.  <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or  <br />MANAGER that cannot be resolved among themselves, MANAGER shall present the matter to  <br />CC&V with MANAGER related recommendations and CC&V shall decide the matter with such  <br />decision being final.    <br />4. PART 4: DEFICIENCIES  <br />When deficiencies (items that do not meet project requirements) are discovered, the CQA  <br />MONITOR shall immediately determine the nature and extent of the problem and notify the  <br />INSTALLER or CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests  <br />will be performed to define the extent of the deficient area.  <br />The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA  <br />MONITOR. If the CONTRACTOR is unable to correct the problem, the CQA MONITOR will