Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400 EARTHWORK CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />Technical Specification No. 01400 Earthwork CQA Page 6  <br />conduct testing after final placement of the materials. The tests to be performed, and the testing  <br />frequency, for each material type are listed in Tables 1 and 2. The testing frequencies specified  <br />in Tables 1 and 2 shall be increased when the CQA MONITOR determines that construction  <br />conditions (such as adverse weather, equipment breakdown, improperly ballasted compactor,  <br />excessive lift thickness, improper soil type, improper moisture conditioning and compaction)  <br />warrant additional tests.  Additional tests will be approved by MANAGER and directed by the  <br />CQA MONITOR.  <br />6.2. Construction Monitoring  <br />The CQA MONITOR will monitor and test all earthwork quality assurance components of the  <br />construction to verify that the construction is in accordance with the SPECIFICATIONS. The CQA  <br />MONITOR shall identify inadequate construction methodologies or materials that may adversely  <br />impact the performance of the facility being constructed and existing structures. The CQA  <br />MONITOR will record visual observations throughout the construction process to ensure that the  <br />materials are placed to the minimum dimensions as shown on the DRAWINGS.  Quality control  <br />testing will be performed by the CONTRACTOR.  <br />6.2.1. Foundation Preparation  <br />The CQA MONITOR shall observe and document the foundation preparation including:  <br />stripping and excavation activities to ensure that CONTRACTOR places the material in the <br />appropriate stockpile (Structural Fill, Select Structural Fill, Leak Detection Fill, Low Volume <br />Solution Collection Fill, Bedding Fill, Soil Liner Fill, Drain Cover  Fill, Fine Shaft Backfill, Pipe <br />Bedding Material and Granular Filter Material), if stockpiling is necessary; <br />stockpiling activities to verify location of stockpile, material type, and dressing; <br />excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage; <br />subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br />otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br />materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br />in accordance with the SPECIFICATIONS; and <br />construction of access roads, drainage control features and erosion control features to verify <br />compliance with the DRAWINGS and SPECIFICATIONS. <br />6.2.2. Placement Of Materials  <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented Rockfill,  <br />Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover