My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400 EARTHWORK CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br />Technical Specification No. 01400 Earthwork CQA Page 6 <br />conduct testing after final placement of the materials. The tests to be performed, and the testing <br />frequency, for each material type are listed in Tables 1 and 2. The testing frequencies specified <br />in Tables 1 and 2 shall be increased when the CQA MONITOR determines that construction <br />conditions (such as adverse weather, equipment breakdown, improperly ballasted compactor, <br />excessive lift thickness, improper soil type, improper moisture conditioning and compaction) <br />warrant additional tests. Additional tests will be approved by MANAGER and directed by the <br />CQA MONITOR. <br />6.2. Construction Monitoring <br />The CQA MONITOR will monitor and test all earthwork quality assurance components of the <br />construction to verify that the construction is in accordance with the SPECIFICATIONS. The CQA <br />MONITOR shall identify inadequate construction methodologies or materials that may adversely <br />impact the performance of the facility being constructed and existing structures. The CQA <br />MONITOR will record visual observations throughout the construction process to ensure that the <br />materials are placed to the minimum dimensions as shown on the DRAWINGS. Quality control <br />testing will be performed by the CONTRACTOR. <br />6.2.1. Foundation Preparation <br />The CQA MONITOR shall observe and document the foundation preparation including: <br />stripping and excavation activities to ensure that CONTRACTOR places the material in the <br />appropriate stockpile (Structural Fill, Select Structural Fill, Leak Detection Fill, Low Volume <br />Solution Collection Fill, Bedding Fill, Soil Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe <br />Bedding Material and Granular Filter Material), if stockpiling is necessary; <br />stockpiling activities to verify location of stockpile, material type, and dressing; <br />excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage; <br />subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br />otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br />materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br />in accordance with the SPECIFICATIONS; and <br />construction of access roads, drainage control features and erosion control features to verify <br />compliance with the DRAWINGS and SPECIFICATIONS. <br />6.2.2. Placement Of Materials <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented Rockfill, <br />Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover
The URL can be used to link to this page
Your browser does not support the video tag.