My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400 EARTHWORK CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br />Technical Specification No. 01400 Earthwork CQA Page 7 <br />Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material, the CQA MONITOR <br />shall: <br />verify the use of appropriate fills; <br />monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to attain <br />compaction, including number of passes, uniformity of compaction coverage, compacted lift <br />thickness, bonding of lifts and in‐place moisture content and dry density is in compliance with <br />the SPECIFICATIONS; <br />monitor Soil Liner Fill surface preparation to verify that the surface has been proof‐rolled, <br />compacted, or hand worked so as to be in a condition suitable for geomembrane installation <br />as discussed in Section 02200 of the SPECIFICATIONS; <br />monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br />for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br />monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br />pipes and that the underlying geosynthetics are not damaged; <br />monitor and document CONTRACTOR verification of in‐place Soil Liner Fill, Bedding Fill, Low <br />Volume Solution Collection Fill and Drain Cover Fill thickness; <br />monitor equipment being used to place Low Volume Solution Collection Fill and Drain Cover <br />Fill to verify that the CONTRACTOR places the material in accordance with the <br />SPECIFICATIONS; <br />monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for areas <br />in which the slope exceeds 4H:1V and that the dozer does not perform unacceptable pivot <br />turns; and <br />monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />7.PART 7: DOCUMENTATION <br />Documentation kept by the CQA MONITOR shall consist of daily record‐keeping, construction <br />problem resolutions, design and SPECIFICATION changes, photographic records of construction, <br />weekly progress reports, chain of custody forms for test sample tracking, and a Construction <br />Certification Report. <br />7.1. Daily Record Keeping <br />Daily records kept by the CQA MONITOR shall consist of field notes, observation and testing data <br />sheets, summary of the daily meeting with CONTRACTOR, and reporting of construction <br />problems and resolutions. The CQA MONITOR shall submit this information on a regular basis to <br />MANAGER for review.
The URL can be used to link to this page
Your browser does not support the video tag.