My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400 EARTHWORK CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br />Technical Specification No. 01400 Earthwork CQA Page 5 <br />discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design; and <br />This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.2. Progress Meetings <br />MANAGER will hold a daily progress meeting, either before the start of work or at the completion <br />of work. At a minimum, this meeting will be attended by the CQA MONITOR and CONTRACTOR. <br />The purpose of this meeting will be to: <br />review all the previous day's accomplishments and activities; <br />review scheduled work location and activities for the day; <br />discuss any problems or potential construction problems; and, <br />review test data. <br />5.3. Deficiency Meetings <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a <br />minimum, these meetings will be attended by the CQA MONITOR and CONTRACTOR. If the <br />problem relates to a design issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER <br />should also be present. The meeting will be documented by the CQA MONITOR. <br />6.PART 6: EARTHWORKS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified earthworks shall be in accordance with the <br />DRAWINGS and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented <br />by CC&V to ensure construction compliance by the CONTRACTOR. The CQA testing program shall <br />consist of construction testing of materials used in the valley leach facility construction. The types <br />of materials are defined in the SPECIFICATIONS. During construction, the CQA MONITOR shall <br />sample and test these soil types to determine if they meet SPECIFICATIONS. The CQA MONITOR <br />shall obtain and test soil samples in accordance with American Society for Testing and Material <br />standards ASTM D75 and ASTM D420. All tests shall be performed by the CQA MONITOR on‐site <br />or in a geotechnical laboratory approved by the CERTIFYING ENGINEER. <br />6.1. Construction Testing <br />During construction, the CQA MONITOR shall test all earthwork components to verify that the <br />construction is in accordance with the SPECIFICATIONS. Testing shall be performed on all soil <br />used in the construction to confirm the materials meet SPECIFICATIONS. The CQA MONITOR shall
The URL can be used to link to this page
Your browser does not support the video tag.