My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400 EARTHWORK CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br /> <br /> <br /> <br />Technical Specification No. 01400 Earthwork CQA Page 2 <br />maintained. MANAGER and CERTIFYING ENGINEER shall be responsible for the resolution of all <br />CQA issues. <br />Duties for this position include the following: <br /> review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the valley <br />leach facility; <br /> preconstruction coordination with the CQA MONITOR to ensure that the CQA MONITOR has <br />performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the CQA <br />Plan can be implemented; <br /> coordination of all construction activities associated with CONTRACTOR; <br /> scheduling and coordinating construction activities with required CQA testing and activities; <br /> overseeing the construction quality control operations performed by CONTRACTOR; <br /> approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur; <br /> ensure that required quality assurance testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA MONITOR; and <br /> ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.3. Design Engineer <br />In this CQA Plan the DESIGN ENGINEER and Engineer of Record (EOR) refers specifically to <br />NewFields who has assumed the role of DESIGN ENGINEER after a thorough review of design <br />documents to include, but not limited to, the DRAWINGS and SPECIFICATIONS. The DESIGN <br />ENGINEER or the CERTIFYING ENGINEER identified in Section 2.4 below, is responsible for <br />approving all DRAWING and SPECIFICATION changes, modifications, or clarifications <br />encountered during construction. <br />2.4. Certifying Engineer <br />In this plan, CERTIFYING ENGINEER refers specifically to NewFields. CERTIFYING ENGINEER is the <br />individual or firm responsible for certifying the construction was performed in compliance with <br />the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER shall be <br />responsible for the resolution of all quality assurance issues. <br />2.5. Construction Quality Assurance Monitor <br />The CQA MONITOR is the firm or individual responsible for performing the CQA tasks outlined in <br />this CQA Plan. The CQA MONITOR is the official CQA representative of CC&V and has the
The URL can be used to link to this page
Your browser does not support the video tag.