Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400 EARTHWORK CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400 Earthwork CQA    Page 1  <br />SECTION 01400 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN  <br />1. PART 1: INTRODUCTION  <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of  <br />the earthworks (soils) components of the valley leach facility at the Cresson Project, Teller  <br />County, Colorado. This program has been developed to assure that the construction of the soil  <br />components are in compliance with the project SPECIFICATIONS and to demonstrate that the  <br />regulatory requirements for the construction are achieved.  <br />The objective of this plan is to assure that proper materials, construction techniques, and  <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. This plan  <br />also provides the means for resolution of problems that may occur during construction.  <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the  <br />quality control (QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to  <br />provide independent third party verification and testing, to demonstrate that the CONTRACTOR  <br />has met its obligations in the supply and installation of earthwork (soils) materials according to  <br />the design, project SPECIFICATIONS, contractual, and regulatory requirements. Quality control is  <br />provided by CONTRACTOR and refers to those actions taken by the CONTRACTOR to ensure that  <br />materials and workmanship meet the requirements of the DRAWINGS and SPECIFICATIONS.  <br />2. PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE  <br />The following section provides descriptions of the parties to this CQA Plan including their  <br />responsibilities and qualifications.  <br />2.1. CC&V  <br />In this CQA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V  <br />owns and operates the valley leach facility.  <br />2.2. Manager  <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor Gold  <br />Mining Company. MANAGER is the official representative of CC&V and is responsible for all  <br />construction activities including oversight and direction during construction. MANAGER is also  <br />responsible for coordinating construction and CQA activities for the project.  <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction  <br />and resolution meetings. As communications coordinator, MANAGER will serve as a liaison  <br />between all parties involved in the project to ensure that ongoing communications are