My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400 EARTHWORK CQA <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />August 27, 2021 <br />Technical Specification No. 01400 Earthwork CQA Page 3 <br />responsibility of overseeing the CQA aspects of the Work. In this CQA Plan the CQA MONITOR is <br />associated with the CERTIFYING ENGINEER, and refers specifically to (To Be Determined). The <br />CQA MONITOR has the authority to stop any aspect of the Work that is not in compliance with <br />the CQA Plan. Work would then be resumed once corrective action has been approved by <br />MANAGER. The specific responsibilities of the CQA MONITOR include: <br />review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br />review all CONTRACTOR QC submittals and make appropriate recommendations; <br />obtain preconstruction and construction samples and perform material evaluation testing as <br />required; <br />monitor foundation preparation activities as discussed in Section 6.3.1 and material <br />placement as discussed in Section 6.3.2; <br />assure that testing equipment used and tests performed are conducted according to <br />SPECIFICATIONS and industry standards; <br />document and report test results to MANAGER; <br />report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />MONITOR, including design or SPECIFICATION changes; <br />prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, tests <br />results (both laboratory and field), professional certification that construction was completed <br />in accordance with the DRAWINGS and SPECIFICATIONS. The Construction Certification <br />Report will be signed and sealed by the CERTIFYING ENGINEER registered in the State of <br />Colorado; <br />monitor the ambient air temperature and fill temperature, as outlined in Section 2200 of the <br />SPECIFICATIONS; and <br />maintain an on‐site soils laboratory and perform regular calibration of equipment. <br />2.6. Earthworks Contractor <br />The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper <br />processing, delivery and placement of all components as outlined in the SPECIFICATIONS. <br />3.PART 3: LINES OF COMMUNICATION <br />The CQA MONITOR shall be capable of direct communication with MANAGER, DESIGN <br />ENGINEER and CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, such <br />as unsatisfactory test results, will be dealt with directly between the CQA MONITOR, and <br />CONTRACTOR. The CQA MONITOR will also discuss any deficiencies with the CERTIFYING <br />ENGINEER.
The URL can be used to link to this page
Your browser does not support the video tag.