Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Underground Openings <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Underground Openings Cost Summary <br />Labor Equipment Materials Totals <br />Adits, Portals & Declines Plugging $4,438 $342 $12,711 $17,491 <br />Shaft Backfill/Cover $1,554 $3,298 N/A $4,852 <br />Shaft Capping $1,072 $82 $556 $1,710 <br />TOTALS $7,064 $3,722 $13,267 $24,053 <br />Adits, Portals & Declines Plugging Uses RS Means Heavy Construction Cost Data for bulkhead production rate, material costs and crews <br />Bulkhead Construction Backfill or Foam (1)Bat Gate or Culvert (2,3,4) <br />Description <br />(required) <br />Bulkhead <br />Volume <br />Backfill <br />(rock) <br />Volume <br />Backfill Equipment <br />Fleet <br />Backfill <br />Productivity Backfill Hours <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Material <br />Cost <br />Total <br />Bulkhead <br />Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Material <br />(Foam) <br />Cost <br />Total <br />Backfill <br />Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Material <br />Cost <br />Total Bat <br />Gate Cost <br />Total <br />Labor <br />Cost <br />cy cy LCY/hr $$$$$$$$$$$$$ <br />1 Idaho Tunnel Portal 8 $3,344 $258 $1,304 $4,906 $0 $0 $0 $0 $0 $0 $0 $0 $3,344 <br />2 Caribou 300 Level Portal 4 $547 $42 $652 $1,241 $0 $0 $0 $0 $0 $0 $0 $0 $547 <br />3 Idaho Tunnel - Access Gate $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,368 $3,368 $0 <br />4 Cross Mine Adit 4 $547 $42 $652 $1,241 $0 $0 $0 $0 $0 $0 $0 $0 $547 <br />5 Caribou 300 - Access Gate $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,368 $3,368 $0 <br />6 Cross Adit - Access Gate $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,368 $3,368 $0 <br />16 $4,438 $342 $2,608 $7,388 $0 $0 $0 $0 $0 $0 $10,103 $10,103 $4,438 <br />Notes:1) Foam costs include 1 hour move to and setup + 1 hr. minimum crew time <br />2) Assumes 1 hr walk-in/walk-out time for equipment <br />3) Batgate assumes 8 hr install time each <br />4) Bat culvert backfill costs based on one 8-hr day (i.e. backfilling hours = 8 hrs). <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 4 of 5 Underground Openings <br />I <br />I