My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Underground Openings <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Underground Openings Cost Summary <br />Labor Equipment Materials Totals <br />Adits, Portals & Declines Plugging $4,438 $342 $12,711 $17,491 <br />Shaft Backfill/Cover $1,554 $3,298 N/A $4,852 <br />Shaft Capping $1,072 $82 $556 $1,710 <br />TOTALS $7,064 $3,722 $13,267 $24,053 <br />Shaft Plugging <br /> Cover/Cap Backfill/Cover <br />Description <br />(required) <br />Cover <br />Area <br />Backfill <br />or Cover <br />Volume <br />Backfill Equipment <br />Fleet <br />Number of <br />Trucks <br />Backfill <br />Productivity <br />Backfill <br />Hours <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Material <br />Cost <br />Total <br />Shaft Cap <br />Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Backfill <br />Cost <br />ft2 cy LCY/hr $$$$$$$ <br />1 Potosi Shaft - Backfill 28 311 #REF!2 370 2 $0 $0 $0 $0 $444 $943 $1,387 <br />2 Potosi Shaft - Concrete Plug 28 41 #REF!2 490 1 $1,072 $82 $556 $1,710 $222 $471 $693 <br />3 Ventilation Shaft 1 - Backfill 3 56 #REF!2 377 1 $0 $0 $0 $0 $222 $471 $693 <br />4 Ventilation Shaft 2 - Backfill 3 56 #REF!2 392 1 $0 $0 $0 $0 $222 $471 $693 <br />5 Ventilation Shaft 1 - Concrete Plug 3 4 #REF!2 490 1 $0 $0 $0 $0 $222 $471 $693 <br />6 Ventilation Shaft 2 - Croncrete Plug 3 4 #REF!2 490 1 $0 $0 $0 $0 $222 $471 $693 <br />68 472 7 $1,072 $82 $556 $1,710 $1,554 $3,298 $4,852 <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 5 of 5 Underground Openings
The URL can be used to link to this page
Your browser does not support the video tag.