My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Underground Openings <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Underground Openings Cost Summary <br />Labor Equipment Materials Totals <br />Adits, Portals & Declines Plugging $4,438 $342 $12,711 $17,491 <br />Shaft Backfill/Cover $1,554 $3,298 N/A $4,852 <br />Shaft Capping $1,072 $82 $556 $1,710 <br />TOTALS $7,064 $3,722 $13,267 $24,053 <br />Underground Openings - Calculations <br />Adits, Declines and Portals - Volume Calculations <br />Concrete Cover/Bulkhead Volume Calculation <br />Using Means Heavy Construction Cost Data (2004) <br />Estimage cover/bulkhead thickness <br />Assumes that all concrete works are reinforced <br />Productivity for crew from Means Heavy Construction Cost Data (2004) adjusted for supervision <br />(addressed in Misc. Costs) and Davis-Bacon Wage Rates <br />Assumes 18 in thick slab <br />Backfill Calculations <br />Uses 1 large and 1 small dozer for adit backfill <br /> Assumes max 400 foot push <br /> Assumes average operator and 50 min/hr availability <br />Uses truck & loader load, haul place fleets for shafts <br />Concrete cap will be 1.5 feet thick, reinforced, structually supported. <br />If concrete cap is used, assume 10 feet of rock backfill on top of cap. <br />Assumes that all concrete works are reinforced <br />If backfill is used, assume overfill by 5 feet <br />Carpenter rate incl Fringe: 0 per hour <br />Shaft Volume Calculations <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 3 of 5 Underground Openings <br />H = Shaft <br />Depth <br />Thickness <br />of B ulkhead (8) C ross-Sect ional Area (A) = W ~ H <br />Volume of Concrete Bulkhead = A x B <br />V olume o f Backfill = A X D <br />d = D iameter <br />Rad ius (r) = ½d <br />Cross-Section al Area (A ) = rrr2 <br />V olume = A x H
The URL can be used to link to this page
Your browser does not support the video tag.