My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-21_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2023-12-21_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 10:14:27 AM
Creation date
12/2/2024 9:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
12/21/2023
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Update
From
DRMS
To
CEMEX
Type & Sequence
CT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont’d Task # TTT Page 4 of 5 <br /> <br />CIRCES Cost Estimating Software <br />N-Secondary Crusher <br />Silos Disposal <br />3629 cy Loading and 5 mile <br />haul, salvage allowed - <br />Steel frame structures <br />3,629.00 CY $13.75 $49,898.75 <br />N-Secondary Crusher <br />Floor <br />1x32x1 Demo. and on-site <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />32.00 SF $2.31 $74.02 <br />O-Homogenizing <br />Silos (3) <br />256739 cf Explosive demolition, <br />large projects - Concrete <br />structures <br />256,739.00 CF $0.41 $105,262.99 <br />O-Silo Disposal 9508 cy Explosive demo, <br />Disposal of material <br />average <br />9,508.00 CY $14.75 $140,243.00 <br />P-Coal Facilities 261383 cf Explosive demolition, <br />large projects - Concrete <br />structures <br />261,383.00 CF $0.41 $107,167.03 <br />P-Coal Facilities <br />Disposal <br />9680 cy Explosive demo, <br />Disposal of material <br />average <br />9,680.00 CY $14.75 $142,780.00 <br />P-Coal Facilities <br />Foundation <br />10x10x5 Demo. and on-site <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />100.00 SF $2.31 $231.31 <br />Q-Stack 1x195x44 Explosive demolition, <br />large projects - Concrete <br />structures <br />270,161.00 CF $0.41 $110,766.01 <br />Q-Stack Disposal 976 cy Explosive demo, <br />Disposal of material <br />average <br />976.00 CY $14.75 $14,396.00 <br />R-Bag House 130x60x45 Plant (3S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />351,000.00 CF $0.88 $307,721.70 <br />S-Raw Material <br />Dryer <br />21x16x16 Plant (1S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />5,376.00 CF $0.85 $4,562.07 <br />S-Raw Material <br />Dryer Foundation <br />Variable Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />74.00 LF $13.88 $1,027.00 <br />U-Warehouse 122x74.5x20 Bldg. (SN) demo./off- <br />site disposal in approved <br />landfill - Max. 15 mile <br />haul <br />181,780.00 CF $0.42 $76,511.20 <br />U-Warehouse <br />Foundation <br />122 LF Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />392.00 LF $13.88 $5,440.33 <br />X-Brick Shed 96x40x18 Bldg. (SC) demo./on- <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />69,120.00 CF $0.29 $19,885.82 <br />X-Brick Shed Floor 96x40 Demo. and on-site <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />3,840.00 SF $1.54 $5,921.28 <br />Z-Kiln 10x24x11 Plant (1S) demo./off-site <br />disposal in approved <br />2,640.00 CF $0.85 $2,240.30
The URL can be used to link to this page
Your browser does not support the video tag.