My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-21_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2023-12-21_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 10:14:27 AM
Creation date
12/2/2024 9:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
12/21/2023
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Update
From
DRMS
To
CEMEX
Type & Sequence
CT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont’d Task # TTT Page 3 of 5 <br /> <br />CIRCES Cost Estimating Software <br />V-Coal Unloading <br />Building <br />71x36x30 Plant (3S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />76,680.00 CF $0.88 $67,225.36 <br />V-Coal Unloading <br />Bases <br />71x36 Demo. and on-site <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />2,556.00 SF $1.54 $3,941.35 <br />AA-Maintenance <br />Shop <br />120x65x24 Plant (3S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />187,200.00 CF $0.88 $164,118.24 <br />AA-Maintenance <br />Shop Floor <br />120x65 Demo. and on-site <br />disposal in existing pit, <br />10 in. thick - Max. <br />10,000 ft. haul <br />7,800.00 SF $1.93 $15,035.28 <br />I-Wash House 10x10x8 Bldg. (SC) demo./on- <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />800.00 CF $0.29 $230.16 <br />I-Wash House Floor 10x10 Demo. and on-site <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />100.00 SF $1.54 $154.20 <br />K-Mobile Eqipment <br />Shed <br />103x64x35 Bldg. (SN) demo./off- <br />site disposal in approved <br />landfill - Max. 15 mile <br />haul <br />230,720.00 CF $0.42 $97,110.05 <br />K-Mobile Equipment <br />Shed Floor <br />103x64x0.67 Demo. and on-site <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />6,592.00 SF $1.54 $10,164.86 <br />L-Burner Bld a 120x91x53 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />578,760.00 CF $1.10 $639,356.17 <br />L-Burner Bld b 48x91x25 Plant (1C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />109,200.00 CF $1.04 $113,458.80 <br />L-Burner Bld <br />Foundation <br />700 LF Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />700.00 LF $13.88 $9,714.88 <br />M-Primary Crusher - <br />Steel <br />10x10x10 Plant (1S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />100.00 CF $0.85 $84.86 <br />M-Primary Crusher <br />Concrete <br />40x20x30 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />25,800.00 CF $1.10 $28,501.26 <br />M-Primary Crusher <br />Floor <br />10x10x067 Demo. and on-site <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />100.00 SF $1.54 $154.20 <br />N-Secondary Crusher <br />Silos <br />97993 cf total Explosive demolition, <br />large projects - Steel <br />structures <br />97,993.00 CF $0.41 $40,177.13
The URL can be used to link to this page
Your browser does not support the video tag.