Laserfiche WebLink
Demo Worksheet Cont’d Task # TTT Page 2 of 5 <br /> <br />CIRCES Cost Estimating Software <br />D-Raw Material Silo <br />Debris Disp <br />785 Explosive demo, <br />Disposal of material <br />average <br />785.00 CY $14.75 $11,578.75 <br />E-Pack House a 150x72x25 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />270,000.00 CF $1.10 $298,269.00 <br />E-Pack House b 45x41x36 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />66,420.00 CF $1.10 $73,374.17 <br />E-Pack House a floor 150x72x1 Demo. and on-site <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />7,560.00 SF $2.31 $17,487.04 <br />E-Pack House b Floor 45x41x1 Demo. and on-site <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />1,845.00 SF $2.31 $4,267.67 <br />F-Clinker Storage <br />Building <br />388x200x79 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />6,130,400.00 CF $1.10 $6,772,252.88 <br />F-Clinker Silo 0.58x73x27 Explosive demolition, <br />large projects - Concrete <br />structures <br />573.00 CF $0.41 $234.93 <br />F-Clinker Silo Disp 0.58x73x27 Explosive demo, <br />Disposal of material <br />average <br />21.00 CY $14.75 $309.75 <br />F-Clinker Floor 388x200 Demo. and on-site <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />77,600.00 SF $2.31 $179,496.56 <br />G-Finished Cement <br />Silos (15) <br />589503 total Explosive demolition, <br />large projects - Concrete <br />structures <br />589,503.00 CF $0.41 $241,696.23 <br />G-Finish Silo <br />Disposal <br />589503 Explosive demo, <br />Disposal of material <br />average <br />21,833.00 CY $14.75 $322,036.75 <br />H Pump House 25x25x15 Bldg. (SC) demo./on- <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />9,375.00 CF $0.29 $2,697.19 <br />H-Pump House Floor 25x15x0.67 Demo. and on-site <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />625.00 SF $1.16 $722.81 <br />J-Electrical Room 26x15x15 Bldg. (SC) demo./on- <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />5,850.00 CF $0.29 $1,683.05 <br />J-Electrical Room <br />Floor <br />26x15 Demo. and on-site <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />390.00 SF $1.16 $451.04 <br />T-Dust Suppressor 70x30x60 Plant (3C) demo./off- <br />site disposal in approved <br />landfill - Max. 15 mile <br />haul <br />126,000.00 CF $1.03 $130,258.80