My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-21_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2023-12-21_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 10:14:27 AM
Creation date
12/2/2024 9:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
12/21/2023
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Update
From
DRMS
To
CEMEX
Type & Sequence
CT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> <br />Task description: Table 2 Demolition Site: Lyons Quarry Permit Action: 2024 Cost Est Permit/Job#: M1977208 <br /> <br />PROJECT IDENTIFICATION Task #: 001 State: Colorado Abbreviation: None <br />Date: 2/13/2024 County: Boulder Filename: M208-001 <br />User: JPL Agency or organization name: DRMS <br /> <br />UNIT COSTS Location adjustment: 91.80 % <br />Structure or Item <br />Description <br /> <br />Dimensions Demolition Menu <br />Selection <br /> <br />Quantity <br /> <br />Unit <br /> Unit Cost <br /> Total Cost <br />A-Admin Building 105x46x14 Bldg. (SC) demo./on- <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />67,620.00 CF $0.29 $19,454.27 <br />A-Admin Bld floor 105x46x0.5 Demo. and on-site <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />4,830.00 SF $1.16 $5,585.90 <br />B-Mill Bld 168x97x53 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />863,688.00 CF $1.10 $954,116.13 <br />B-Mill Bld Floor 168x97x0.5 Demo. and on-site <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />16,296.00 SF $1.16 $18,846.32 <br />B-Raw Mill <br />Foundation <br />Sum of LF <br />Provided <br />Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />107.00 LF $13.88 $1,484.99 <br />B-Finish Mill <br />Foundation <br />Sum of LF <br />Provided <br />Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />168.00 LF $13.88 $2,331.57 <br />B-Foundation Sum of LF <br />Provided <br />Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />225.00 LF $13.88 $3,122.64 <br />C-Control Center 88x37x38 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />123,728.00 CF $1.10 $136,682.32 <br />C-Control Center b 37x34x20 Plant (3C) demo./on-site <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />25,160.00 CF $1.10 $27,794.25 <br />C-Control Center <br />Floor <br />88x37 Demo. and on-site <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />3,265.00 SF $1.16 $3,775.97 <br />D-Raw Material Silos 0.58x73x27 Explosive demolition, <br />large projects - Concrete <br />structures <br />38,263.00 CF $0.41 $15,687.83
The URL can be used to link to this page
Your browser does not support the video tag.