Laserfiche WebLink
Demo Worksheet Cont’d Task # TTT Page 5 of 5 <br /> <br />CIRCES Cost Estimating Software <br />landfill - Max. 15 mile <br />haul <br />BB-PreHeater Tower 55x40x60 Explosive demolition, <br />large projects - Steel <br />structures <br />132,000.00 CF $0.41 $54,120.00 <br />BB-PreHeater Tower <br />Disposal <br />4888 cy Loading and 5 mile <br />haul, salvage allowed - <br />Steel frame structures <br />4,888.00 CY $13.75 $67,210.00 <br />BB-PreHeater <br />Foundation <br />55 LF Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />190.00 LF $13.88 $2,636.90 <br />CC-Oil House 16x32x11 Bldg. (SN) demo./off- <br />site disposal in approved <br />landfill - Max. 15 mile <br />haul <br />5,632.00 CF $0.42 $2,370.51 <br />CC-Oil House <br />Foundation <br />96 LF Demo. and on-site <br />disposal in existing pit, <br />1.5 ft. x 2 ft. - Max. <br />10,000 ft. haul <br />96.00 LF $6.94 $666.16 <br />DD-Blower Building 32x12x10 Plant (1S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />3,840.00 CF $0.85 $3,258.62 <br />DD-Blower Building <br />Foundation <br />88 LF Demo. and on-site <br />disposal in existing pit, <br />1.5 ft. x 2 ft. - Max. <br />10,000 ft. haul <br />88.00 LF $6.94 $610.65 <br />EE-SNCR 10x12x11 Plant (1S) demo./off-site <br />disposal in approved <br />landfill - Max. 15 mile <br />haul <br />1,320.00 CF $0.85 $1,120.15 <br />EE-SNCR <br />Foundation <br />44 LF Demo. and on-site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />44.00 LF $13.88 $610.65 <br />Pavement-All outside <br />Pavement <br />22,222 cy USER PROVIDED <br />ITEM <br />22,222.00 CY $54.21 $1,204,654.62 <br /> <br />Job Hours: 22,600.00 <br />Subtotal <br />(unadjusted): $12,866,512.68 <br />Total Cost <br />(adjusted for <br />location): $11,811,458.64 <br />