Laserfiche WebLink
environmental impact and facilitating post-removal reclamation. <br /> Compliance with Rule 1.1:All temporary structures are defined as part of the"affected land"and must therefore meet gen- <br /> eral standards for site stability and operational safety. <br /> Approval and Permits: Prior to setup,permits for temporary structures will be obtained as required under the MLRA, <br /> ensuring all structures are approved for their intended operational and environmental impact. <br /> 5.6.2 Stability and Reclamation Standards <br /> According to Rule 3 - Reclamation Performance Standards,temporary structures like industrial tents must be constructed <br /> in a way that supports site reclamation objectives and stability. These standards cover: <br /> • Soil and Erosion Control:Temporary structures will be located and supported to prevent soil erosion and ensure stabil- <br /> ity in compliance with Rule 3.1.Measures include compacted base installation,erosion mats,and drainage systems to <br /> protect against environmental degradation. <br /> • Post-Removal Reclamation: Following the removal of temporary structures,the affected land will undergo reclamation <br /> to restore the land to its baseline condition.This includes regrading,reseeding,and erosion control as necessary. <br /> 5.6.3 Environmental Protection Plans <br /> All temporary structures will be inspected regularly to verify that they meet environmental control standards for water <br /> drainage,runoff management,and environmental stability. <br /> 5.6.4 Monitoring and Reporting <br /> Regular inspections and ongoing monitoring will support both safety and regulatory compliance for all temporary struc- <br /> tures on the site: <br /> Compliance with Rule 8: To prevent any unforeseen environmental or operational hazards,all temporary structures will <br /> be assessed under Rule 8,which mandates site inspection and regular reporting. These procedures ensure all industrial <br /> tents or other temporary facilities remain compliant with stability and emergency standards,maintaining safe operational <br /> conditions. <br /> 5.6.5 Safety and Compliance Audits <br /> Each temporary structure installation will undergo safety checks and compliance audits in alignment with state require- <br /> ments: <br /> Documentation and Transparency: Records of all installations,inspections,and safety measures will be maintained in <br /> compliance with MLRB standards,ensuring transparency and accountability for the lifecycle of each temporary structure <br /> on the site. <br /> 5.7 Steep Slope Protection <br /> 10 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />