Laserfiche WebLink
EXHIBIT E <br /> 6.4.5 EXHIBIT E - Reclamation Plan <br /> (A) Description of The Type of Reclamation <br /> The West Side Placer Project will implement Progressive Reclamation methods,continuously and systematically reclaiming <br /> land as mining operations advance,rather than postponing reclamation until the conclusion of all mining activities. This <br /> proactive approach involves several key stages to restore the land's natural ecosystem effectively and sustainable. <br /> 1. Initial Reclamation Planning <br /> Comprehensive site surveys and careful preparation of each mining block lay the foundation for effective reclamation, <br /> ensuring all land affected by mining will be efficiently restored. <br /> 2. Stripping and Preservation of Topsoil <br /> In this phase,the nutrient-rich topsoil is carefully stripped and preserved before mining activities commence. Long- <br /> term storage will be addressed by covering the topsoil with a geotextile layer or a cover seed crop to prevent erosion <br /> and maintain soil health. <br /> 3. Mining Blocks and Returning Washed Ore <br /> This stage involves the extraction of minerals,after which processed materials are returned to the mined areas, <br /> stabilizing the ground for future reclamation efforts. <br /> 4. Grading and Spreading Stockpiled Topsoil <br /> Once mining is completed in an area,the land is graded to restore its original contours. The stored topsoil is then <br /> redistributed over the graded area,readying it for vegetation. <br /> 5. Seeding with Native Vegetation <br /> A mixture of native seeds and shrubs is planted to re-establish the natural ecosystem.An imprint seeder will be used to <br /> ensure seeds make solid contact with the soil,improving germination and supporting robust growth. <br /> 6. Noxious Weed Management <br /> The West Side Placer Project will implement preventive and responsive strategies to manage noxious weed infestations. <br /> This includes regular monitoring,adaptive control methods,and post-mining restoration efforts,supported by <br /> thorough training for all personnel. <br /> 7. Monitoring and Inspection <br /> Annual surveys conducted by qualified technicians will monitor the success of reclamation efforts. Reports,including <br /> photographic documentation,will be submitted yearly to track progress and ensure compliance with reclamation goals. <br /> 26 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />