My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> 6.4.5 EXHIBIT E - Reclamation Plan <br /> (A) Description of The Type of Reclamation <br /> The West Side Placer Project will implement Progressive Reclamation methods,continuously and systematically reclaiming <br /> land as mining operations advance,rather than postponing reclamation until the conclusion of all mining activities. This <br /> proactive approach involves several key stages to restore the land's natural ecosystem effectively and sustainable. <br /> 1. Initial Reclamation Planning <br /> Comprehensive site surveys and careful preparation of each mining block lay the foundation for effective reclamation, <br /> ensuring all land affected by mining will be efficiently restored. <br /> 2. Stripping and Preservation of Topsoil <br /> In this phase,the nutrient-rich topsoil is carefully stripped and preserved before mining activities commence. Long- <br /> term storage will be addressed by covering the topsoil with a geotextile layer or a cover seed crop to prevent erosion <br /> and maintain soil health. <br /> 3. Mining Blocks and Returning Washed Ore <br /> This stage involves the extraction of minerals,after which processed materials are returned to the mined areas, <br /> stabilizing the ground for future reclamation efforts. <br /> 4. Grading and Spreading Stockpiled Topsoil <br /> Once mining is completed in an area,the land is graded to restore its original contours. The stored topsoil is then <br /> redistributed over the graded area,readying it for vegetation. <br /> 5. Seeding with Native Vegetation <br /> A mixture of native seeds and shrubs is planted to re-establish the natural ecosystem.An imprint seeder will be used to <br /> ensure seeds make solid contact with the soil,improving germination and supporting robust growth. <br /> 6. Noxious Weed Management <br /> The West Side Placer Project will implement preventive and responsive strategies to manage noxious weed infestations. <br /> This includes regular monitoring,adaptive control methods,and post-mining restoration efforts,supported by <br /> thorough training for all personnel. <br /> 7. Monitoring and Inspection <br /> Annual surveys conducted by qualified technicians will monitor the success of reclamation efforts. Reports,including <br /> photographic documentation,will be submitted yearly to track progress and ensure compliance with reclamation goals. <br /> 26 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.