My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> (B) A Comparison of The Proposed Post Mining Land Use. <br /> Table E.(B).1,compares post-mining land use,including rangeland,wildlife habitat,and renewable energy. State Land <br /> Board has expressed that Wildlife Habitat as the intended post mining use. <br /> See section 6.4.6, EXHIBIT F-Reclamation Plan Maps,for more information on post-mining land use and related maps. <br /> TABLE E.(B).1 <br /> Post Mining Use Purpose <br /> Rangeland Livestock grazing and Restores vegetation and soil,risk of erosion Benefits through livestock,supports Sustainable with proper <br /> foraging and habitat destruction if overgrazed rural economies management and conservation <br /> practices <br /> Wildlife Habitat Preserving and enhancing Positive for biodiversity and ecological balance Potential ecotourism,hunting,limited Highly sustainable,contributes to <br /> habitat for wildlife direct economic benefits long-term environmental health <br /> (C) The Reclamation Plan <br /> Reclamation at the West Side Placer will be a continuous process. This involves: Boundry GPS surveys and flagging. Photo <br /> documentation of pre-mining state,stockpiling topsoil,mining,returning ore to the active mining block,contouring, <br /> reapplying topsoil,seeding,and monitoring.AuPt Industries has already successfully implemented reclamation under their <br /> 110-2 permit with excellent results. <br /> The mining operation is structured into distinct stages,each critical to the overall project. <br /> 1.0 Initial Reclamation Planning: Site Surveys and Mining Block Preparation <br /> Activities that take place before mining of any ground. <br /> Reclamation Step Time Of Expected Time-frame Key Activities and Details Equipment Personnel Deliverables/Outcomes <br /> Year <br /> 1.1 Site Survey Year round 3 Weeks st the Photographic GPS Survey GPS technician and Photos and GPS information <br /> commencement of the documentation of site. Equipment photographer will be logged into an online <br /> project Flora and Fauna Photographic Qualified biologist project database. <br /> Surveys. Equipment Flora and Fauna report will <br /> UAV be logged into on-line project <br /> database <br /> 1.2 Site preparation for Year-round 2 Months Document ground pre GPS Survey Site surveyor Ground ready for wash-plant <br /> processing plant and post mining. Equipment Mining crew installation <br /> Top-soil stripping and Photographic <br /> stockpiling. Equipment <br /> Level ground. Dozer <br /> Scraper <br /> Loader <br /> 1.3 Mining Block Survey Year Round 1 Day per block Flag corners of mining GPS Survey GPS technician Photos and GPS information <br /> block Equipment Photographer will be logged into an on-line <br /> Photo document site Photographic Mining crew project database. <br /> before any disruption Equipment Flagging of block corners <br /> UAV <br /> 27 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.