Laserfiche WebLink
5. <br /> - impounding mill or processing wastes. • <br /> 9. (a) The anticipated affect the proposed work will have on the <br /> surface resources of the land and subsurface waters draining <br /> . i _ . from the operation will be <br /> briefly describe) <br /> (b) All timber cut from right-of-way or work sites not required <br /> in the operation will be disposed of by the Forest Service by <br /> oaIe. In the event sale and removal cannot be made within the <br /> required schedule of the operator, the operator will cut and <br /> deck the timber at locations prescribed by the District�_ Ranger. <br /> /) <br /> The volumeof timber required in the operation is ___ board <br /> feet. Enid timber will be used for prospecting, exploration, <br /> develupm•nt mining or processing operations and uses reasonably <br /> in,Ident thereto, or for the construction of buildings or <br /> structures in connection therewith. Any severance and removal <br /> ... shall be in accordance with sound principles of forest <br /> management, as specified by the District Ranger. <br /> 10. (a) The following measures will be taken to minimize the <br /> impaet_: of the work on the surface resources: (Sec.228.8, <br /> Requirements for Environmental Protection). <br /> 1. Roads: E/tW/921.fL 1 c. ,4 Ai7iw j /(/.Eces5,1-Jf - , <br /> y' (provisions for meeting required s dards of construction <br /> ///���y <br /> and event reclamation, stabilization by proper grading, drainage <br /> control, surface treatment, revegetation) <br /> e. Protection of streams, springs and underground (subsurface waters): <br />