Laserfiche WebLink
4. <br /> (k) All construction.will stay at least AVA- feet distance / <br /> ' from creeks, lakes or springs and fording of creeks or [` <br /> temporary bridges will be at only approved locations. <br /> 5. (a) The following heavy equipment will be used at the work <br /> sites in conduct of the operation: fE✓t-/ietv. 9 <br /> (specify type and size <br /> JaRt.. OA/Otreeme 44s A uc,Cl.t-ir !lgc/owE_ <br /> of all earth moving equipment) <br /> 6. (a) The type of work to be done at the work sites which will <br /> result in surface resource disturbance will be: AN-Leo <br /> (specify <br /> 7Ati 5 <br /> band-work, drilling, sampling and testing, excavation of <br /> cuts, pits or trenches, sinking shaft(s), driving adit(s), <br /> other) <br /> (b) Work will begin 1W,1)e. /?! 'and terminate <br /> (approximate date) <br /> /Nat,, // ,V <br /> (approximate date) <br /> 7. (a) The acres of land which will be disturbed are estimated at <br /> approximately / acre,. <br /> 8. (a) The planned operations PHI- /4br include milling or <br /> (will or will not) <br /> processing operations and wherein such operations will <br /> require processing of mineral materials, the type of <br /> process will be <br /> • (gravity, flotation, electro-magnetic, <br /> leaching, cyanidation, heavy-media separation, etc.) <br /> (b) Approximately ./ ARE of land will be required for <br /> solid waste, and -O'" acres will be required for <br />